2021-06-22 18:44:331. SATISFIED. PROVIDE A TRAFFIC STATEMENT.
 2. SATISFIED. INCLUDE PARKING CALCULATIONS ON THE SITE
 DATA TABLE.
 3. SATISFIED. CLARIFY HOW PARKING IS HANDLED FOR
 PROGRAMMED EVENTS, IF ANY.
 4. SATISFIED. INCLUDE BICYCLE PARKING ON THE SITE PLAN.
 CONSIDER PROVIDING ADDITIONAL BICYCLE PARKING SPACES
 BEYOND CODE REQUIREMENTS.
 5. SATISFIED. REPAVE 19TH STREET AND EAST PARKWAY AFTER
 UTILITY TIE-IN.
 6. SATISFIED. PROVIDE PEDESTRIAN CONNECTION TO THE
 PROPOSED GYMNASIUM.
 7. PARTIALLY SATISFIED. PROVIDE CROSSWALK AT THE EAST
 PARKWAY/20TH STREET INTERSECTION, ACROSS EAST PARKWAY
 AT 21ST STREET AND 19TH STREET.
 8. CROSSWALK ACROSS EAST PARKWAY MUST BE PERPENDICULAR.
 ADD ANOTHER CROSSWALK ON THE NORTHERN SIDE. CLOSE
 EXISTING CENTRAL RAMP, INSTALL TWO NEW RAMPS AT THE
 CORRESPONDING CROSSWALK LOCATION
 9. NOT SATISFIED. PLEASE SHOW CURBS AND CURB-CUTS ON
 BOTH SIDES OF STREET SURROUNDING THE SITE.
 10. SATISFIED. PLEASE SHOW RIGHT-OF-WAY WIDTHS AND
 STREET WIDTHS.
 11. SATISFIED. PROVIDE PHOTOMETRICS FOR THE SITE.
 12. SATISFIED. PLEASE VERIFY IF THERE ARE SUFFICIENT
 ON-STREET LIGHTINGS SURROUNDING THE SITE AS MOST
 VISITORS ARE EXPECTED TO PARK ON-STREET.
 13. SATISFIED. PLEASE VERIFY ALL EXISTING UTILITIES ARE
 ACCOMMODATED AS IT APPEARS THE PROPOSED BUILDING IS
 DIRECTLY ON TOP OF EXISTING UTILITIES.
 14. SATISFIED. PLEASE VERIFY ALL IRRIGATION NEEDS ARE
 PROPERLY ADDRESSED.
 15. SATISFIED. PLEASE VERIFY ALL DRAINAGE NEEDS ON
 ROADWAYS ALONG THE SITE FRONTAGE ARE PROPERLY
 ADDRESSED.
  
 VALERIO ORICCHIO
 CITY TRANSPORTATION ENGINEER
 561-494-1092
 [email protected]
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved