Plan Review Notes
Plan Review Notes For Project Z19090032
Project Number Z19090032
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-11-13 09:39:00THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
  
 HTTPS://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO
 RMS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. OBTAIN INVERT ELEVATIONS OF EXISTING SANITARY AND
 DRAINAGE STRUCTURES.
  
 2. SHOW MILL AND RESURFACING LIMITS FOR TRENCH CUTS
 WITHIN THE RIGHT-OF-WAY. SEE CITY DETAILS.
  
 3. CAN SEWER LATERAL CONNECTION BE MADE WITHOUT
 INSTALLING A CONFLICT STRUCTURE WITH THE DRAINAGE PIPE.
  
 4. PROVIDE CCTV OF DRAINAGE SYSTEM ON 19TH STREET WEST
 OF EAST PARKWAY AND ON EAST PARKWAY FROM 19TH STREET TO
 THE MANHOLE NORTH OF 19TH STREET.
  
 5. DRAINAGE SYSTEM TO BE DESIGN PER SFWMD ERP CRITERIA.
  
 6. LABEL PROPOSED PIPE SIZES AND MATERIAL. MINIMUM 15"
 RCP PIPE TO BE USED WITHIN THE RIGHT-OF-WAY.
  
 7. LABEL VERTICAL DATUM AND PROVIDE CONVERSION EQUATION
 TO NGVD 1929.
  
 8. LAYOUT UTILITIES TO AVOID EXISTING TREES IF
 POSSIBLE.
  
 9. LABEL THE EXISTING DRAINAGE PIPE SIZE FROM THE ROUND
 CONCRETE PLAY AREA.
  
 10. PROVIDE EXFILTRATION TRENCH DETAIL WITH DIMENSIONS.
  
 11. ASPHALT MODIFICATION NEXT TO A CURB RAMP WILL
 REQUIRE THE CURB RAMP TO BE CONSTRUCTED TO CURRENT
 STANDARDS.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  