Text |
| 2019-11-13 09:39:00 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | |
| | HTTPS://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FO |
| | RMS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. OBTAIN INVERT ELEVATIONS OF EXISTING SANITARY AND |
| | DRAINAGE STRUCTURES. |
| | |
| | 2. SHOW MILL AND RESURFACING LIMITS FOR TRENCH CUTS |
| | WITHIN THE RIGHT-OF-WAY. SEE CITY DETAILS. |
| | |
| | 3. CAN SEWER LATERAL CONNECTION BE MADE WITHOUT |
| | INSTALLING A CONFLICT STRUCTURE WITH THE DRAINAGE PIPE. |
| | |
| | 4. PROVIDE CCTV OF DRAINAGE SYSTEM ON 19TH STREET WEST |
| | OF EAST PARKWAY AND ON EAST PARKWAY FROM 19TH STREET TO |
| | THE MANHOLE NORTH OF 19TH STREET. |
| | |
| | 5. DRAINAGE SYSTEM TO BE DESIGN PER SFWMD ERP CRITERIA. |
| | |
| | 6. LABEL PROPOSED PIPE SIZES AND MATERIAL. MINIMUM 15" |
| | RCP PIPE TO BE USED WITHIN THE RIGHT-OF-WAY. |
| | |
| | 7. LABEL VERTICAL DATUM AND PROVIDE CONVERSION EQUATION |
| | TO NGVD 1929. |
| | |
| | 8. LAYOUT UTILITIES TO AVOID EXISTING TREES IF |
| | POSSIBLE. |
| | |
| | 9. LABEL THE EXISTING DRAINAGE PIPE SIZE FROM THE ROUND |
| | CONCRETE PLAY AREA. |
| | |
| | 10. PROVIDE EXFILTRATION TRENCH DETAIL WITH DIMENSIONS. |
| | |
| | 11. ASPHALT MODIFICATION NEXT TO A CURB RAMP WILL |
| | REQUIRE THE CURB RAMP TO BE CONSTRUCTED TO CURRENT |
| | STANDARDS. |
| | |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| | |
| |