Plan Review Notes
Plan Review Notes For Project Z19090015
Project Number Z19090015
Review Stop TRAFFIC
Sequence Number 4
Notes
Date Text
2020-02-26 13:39:05TRAFFIC ANALYSIS COMMENTS:
 1. PROVIDE COUNTY TPS LETTER.
  
 SITE PLAN COMMENTS:
 2. PLANNED DEVELOPMENT (PD) IS REQUIRED TO BE
 CONSISTENT WITH ALL ELEMENTS OF THE CITY'S
 COMPREHENSIVE PLAN. PER THE CITY'S COMPREHENSIVE PLAN
 TRANSPORTATION ELEMENT, CONSTRUCT A 12-FOOT SIDEWALK ON
 VILLAGE BOULEVARD ALONG SITE FRONTAGE. THE COST
 ESTIMATE FOR THE PROPOSED IN-LIEU PAYMENT DOES NOT
 APPEAR TO INCLUDE DEMOLITION, MOT, MOBILIZATION,
 STABILIZATION AND UTILITY ADJUSTMENT WHICH MAY BE
 ESSENTIAL TO THE SIDEWALK IMPROVEMENT.
 3. THE CITY DOES NOT SUPPORT THE EXCLUSIVE RIGHT-TURN
 LANE AT THE SITE DRIVEWAY BECAUSE THIS WOULD FURTHER
 ENCOURAGE HIGHER VEHICULAR SPEED ON VILLAGE BOULEVARD.
 4. THE PROPOSED DEVELOPMENT IS EXPECTED TO INCREASE
 TRAFFIC AT THE SITE DRIVEWAYS BY MORE THAN 20 TIMES
 WHICH WILL INCREASE CONFLICT WITH EXISTING TRAFFIC ON
 VILLAGE BOULEVARD. PLEASE PROPOSE MITIGATIONS SUCH AS
 ROUNDABOUTS AND MEDIAN CLOSURE TO MITIGATE FOR THE
 INCREASED CONFLICT AND PROVIDE SAFER PEDESTRIAN ACCESS
 TO THE PROPERTY.
  
 SHING TSOI
 CITY IN-HOUSE TRAFFIC CONSULTANT
 561-494-1141
 [email protected]
 (IN-HOUSE ON TUESDAYS AND WEDNESDAYS)
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved