Date Text
2019-12-18 13:32:31PLANS AND PLATS REVIEW COMMITTEE (PPRC) ZONING REVIEW
 ________________________________________
  
 DATE OF REVIEW: 12.18.2019
 PROJECT NO.: Z19090014 AND Z19090015
 CASE NO.: PB 1842 AND PB 1842A
 ________________________________________
  
 PLEASE PROVIDE A WRITTEN RESPONSE TO THE FOLLOWING
 REVIEW COMMENTS:
  
 1. APPROVAL LETTER FROM PALM BEACH COUNTY SHALL BE
 PROVIDED INDICATING THAT THE PROJECT COMPLIES WITH THE
 COUNTY TRAFFIC PERFORMANCE STANDARDS.
  
 2. DID ALEX REVIEW THE UPDATED FLU TRAFFIC ANALYSIS?
  
 3. UTILITY LETTER FROM COMCAST SHALL BE PROVIDED.
  
 4. SOUTHBOUND LEFT TURN LANE REQUIRED AT THE PRIMARY
 RESIDENTIAL ENTRANCE?WHAT IS THE IMPACT ON THE EXISTING
 MEDIAN (TREES, ETC.)? WAS THIS REVIEWED BY THE VILLAGES
 POA?
  
 5. THE TRAFFIC ANALYSIS INDICATES A VOLUNTARY
 RESTRICTION PROPOSED AT 30.5 DU/ACRE?WHAT IF THE FLU IS
 CHANGED TO MFMD (MAX 20 DU/ACRE) AND/OR THE RESTRICTION
 IS AT 14.52 DU/ACRE? THIS WOULD BE CONSISTENT WITH THE
 UNDERLYING MF14 ZONING DESIGNATION THAT IS PROPOSED.
  
 6. WHAT WERE THE CONCERNS OF THE SPENCER LAKES HOA AND
 HOW ARE THEY BEING ADDRESSED?
  
 7. THE ZONING MAP ON THE COVER SHEET OF THE
 ARCHITECTURAL PLANS SHOULD BE UPDATED TO THE CITY OF
 WEST PALM BEACH?S MAP; DO NOT USE PALM BEACH COUNTY?S
 AS THE CITY?S DESIGNATIONS ARE NOT SPECIFIED.
  
 8. SHEET SP-1 WAS MISSING OUT OF THE ARCHITECTURAL PDF.
  
 9. THE SITE PLAN SHALL SHOW THE ENTIRE PROPERTY,
 INCLUDING THAT WHICH IS LAKE AREA.
  
 10. THE SITE PLAN SHOULD BE AT A LARGER SCALE. IT?S OK
 TO HAVE THE OVERALL SITE PLAN AT SUCH A SMALL SCALE,
 BUT A LARGER SCALE (MULTIPLE SHEETS WITH MATCH LINES)
 NEEDS TO BE PROVIDED.
  
 11. ALL DRIVE AISLES CONTAINING PARKING ROWS ARE TO BE
 A MINIMUM OF 24 FEET IN WIDTH; ONLY 22 FEET IS SHOWN.
 DRIVE AISLE THAT DO NOT HAVE PARKING BACKING INTO THEM
 CAN BE NARROWER.
  
 12. FENCING WITHIN THE FRONT SETBACK (25 FEET) SHALL
 NOT EXCEED 4 FEET IN HEIGHT.
  
 13. DETAIL SHALL BE PROVIDED FOR ALL FENCING.
  
 14. THE SITE PLAN SHOULD PROVIDE THE REFERENCES FOR
 DETAILS THAT ARE PROVIDED. FOR EXAMPLE, SHEET SP-1
 SHOULD REFERENCE DETAIL #1, SHEET LH-7 FOR THE MONUMENT
 SIGN AND DETAIL #2, SHEET LH-7 FOR THE TRELLIS FEATURE.
  
 15. SETBACKS SHALL BE PROVIDED FOR THE PROPOSED TRELLIS
 FEATURE.
  
 16. THE POOL NEEDS TO BE ENCLOSED BY A CONTINUOUS FENCE
 OF AT LEAST 4 FEET IN HEIGHT WITH
 SELF-CLOSING/SELF-LATCHING GATES. LATCHES SHALL BE AT
 LEAST 54 INCHES ABOVE GRADE.
  
 17. PLEASE EXPLAIN THE FUNCTION OF THE MAIL KIOSK. WILL
 USPS HAVE ACCESS INSIDE THE MAIN GATES AND BE ABLE TO
 PARK IN FRONT OF THE KIOSK, OR ARE THEY EXPECTED TO
 PARK AT THE CLUBHOUSE?
  
 18. BIKE RACKS SHALL BE PROVIDED FOR BUILDING #6 AND
 THE CLUBHOUSE.
  
 19. THE JUSTIFICATION STATEMENT INDICATES THAT THE
 NORTH DRIVEWAY (CROSS-ACCESS WITH THE CHURCH) IS
 EMERGENCY EGRESS ONLY?BUT THE SITE PLAN INDICATES AN
 ENTRANCE AS WELL AS AN EXIT; PLEASE EXPLAIN.
  
 20. IF THE INTENT IS THAT THE COMMUNITY WOULD BE
 COMPLETELY ENCLOSED BY FENCING, THERE ARE SEVERAL GAPS
 THAT DO ALLOW UNRESTRICTED ACCESS.
  
 21. SETBACKS SHALL BE PROVIDED FOR ALL BUILDINGS WITHIN
 PROXIMITY TO A PROPERTY LINE. SETBACKS WERE NOT SHOWN
 FOR THE CLUBHOUSE AND TRASH COMPACTOR.
  
 22. SHEET TC-1 WAS NOT PROVIDED.
  
 23. DETAILS SHALL BE PROVIDED FOR THE SCREENING AROUND
 THE PROPOSED LIFT STATION.
  
 24. THE AREA AROUND THE TRASH COMPACTOR NEEDS TO BE
 WORKED OUT IN MORE DETAIL. THERE SEEMS TO BE
 CONSTRAINTS IN ACCESSING THE TRASH COMPACTOR BASED UPON
 THE LOCATION OF THE LIFT STATION SCREENING, ETC.
  
 25. A WALKWAY NEEDS TO BE PROVIDED ON THE NORTHWEST
 SIDE OF THE DETACHED GARAGE NEAR BUILDING #3 SO THAT
 THERE IS A CONTINUOUS ACCESSIBLE ROUTE TO THE DOG PARK.
  
 26. AS REQUIRED BY THE DEVELOPMENT APPLICATION, ALL
 SIDEWALKS SHALL BE DIMENSIONED. PARTICULAR ATTENTION
 NEEDS TO OCCUR AT THOSE AREAS WHERE THE VEHICLE
 OVERHANG OCCURS OVER THE SIDEWALK. ENSURE THAT THE
 MINIMUM WIDTH OF THE ACCESSIBLE ROUTE IS PROVIDED.
  
 27. DETAILS SHALL BE PROVIDED OF THE PROPOSED MONUMENT
 SIGN AT THE MAIN ENTRANCE.
  
 28. PLEASE PROVIDE INFORMATION REGARDING THE TRASH
 COMPACTOR. THE MANEUVERABILITY PLAN SHOWS A
 FRONT-LOADING DUMP TRUCK?BUT IF THE COMPACTOR CONSISTS
 OF A LARGE ROLL-OFF DUMPSTER, THEN THE TRUCK
 INFORMATION IS INCORRECT AND REQUIRES THAT IT BE LOADED
 ONTO THE REAR OF THE VEHICLE.
  
 29. WHAT TYPE OF FIRE TRUCK WAS BEING USED FOR THE
 MANEUVERABILITY PLAN. THERE IS POSSIBLE CONCERN
 REGARDING THE ?CHICANE? THAT IS CREATED BY THE
 ALIGNMENT OF THE NON-VISITOR DRIVE WITH THE MAIN
 ENTRANCE GATE.
  
 30. DETAIL NEEDS TO BE PROVIDED INDICATING THAT THE
 SIGNAGE REQUIRED FOR THE ACCESSIBLE PARKING SPACES WILL
 NOT OCCUR WITHIN THE REQUIRED OVERHANG, AND THAT IT
 WILL NOT ENCROACH INTO THE REQUIRED ACCESSIBLE
 SIDEWALK.
  
 31. A TURNAROUND SPACE NEEDS TO BE PROVIDED AT THE
 DEAD-END PARKING IN FRONT OF BUILDING #4.
  
 32. THE JUSTIFICATION STATEMENT INDICATES THAT ONE OF
 THE ?INNOVATIVE? FEATURES OF THE PROPOSED PROJECT IS
 THE USE OF CURBING (INSTEAD OF WHEEL STOPS) TO INCREASE
 THE AMOUNT OF LANDSCAPE AREA. ACTUALLY, MOST OF THE
 AREAS WHERE THIS OCCURS, THE OVERHANG OCCURS OVER A
 SIDEWALK, NOT AN EXPANDED LANDSCAPE AREA. THERE ARE A
 LOT OF AREAS WHERE WHEEL STOPS ARE STILL BEING PROPOSED
 ADJACENT TO LANDSCAPING, AND IT DOESN?T APPEAR THAT
 THIS IS NECESSARY TO ACCOMMODATE DRAINAGE.
  
 33. THE DIMENSIONS ON THE BUILDING ELEVATIONS ARE
 INCORRECT. THE DIMENSIONS BETWEEN THE LEVELS DO NOT
 CORRESPOND WITH THE ELEVATION DIMENSIONS. FOR EXAMPLE,
 THE PLANS INDICATE 12? 8? BETWEEN THE TOP OF BEAM AND
 THE TOP OF RIDGE, BUT THE ELEVATIONS GIVEN SHOW A 13?
 2? DIFFERENCE.
  
 34. THE DATA TABLE INDICATES THAT BICYCLE PARKING IS
 REQUIRED FOR EVERY 15 PARKING SPACES, BUT THE ZLDRS
 ONLY REQUIRE 1 BICYCLE SPACE FOR EVERY 20 PARKING
 SPACES.
  
 35. THE JUSTIFICATION STATEMENT INDICATES THAT 550
 PARKING SPACES ARE BEING PROVIDED, BUT SHEET SP-1
 INDICATES 556. ENSURE THAT ALL PLANS AND NARRATIVES ARE
 CONSISTENT.
  
 36. PARKING DETAIL SHALL BE PROVIDED.
  
 37. LANDSCAPE TERMINAL ISLAND NORTH OF BUILDING #6, AT
 THE WEST END OF THE 7 PARKING SPACES, DOES NOT MEET THE
 MINIMUM DIMENSIONAL/LANDSCAPING REQUIREMENTS.
  
 38. TERMINAL LANDSCAPE ISLAND ARE TO BE PROVIDED
 BETWEEN THE GARAGES AND THE ADJACENT PARKING ROWS.
 ________________________________________
  
 PLEASE NOTE THE FOLLOWING WHEN RESUBMITTING:
  
 A) WRITTEN RESPONSES TO COMMENTS MADE BY ALL
 DEPARTMENTS SHALL BE PROVIDED UPON RESUBMISSION.
  
 B) 15 SETS OF REVISED PLANS AND/OR DOCUMENTS SHALL BE
 PROVIDED, ALONG WITH ONE (1) REDUCED COPY (11IN X
 17IN), AND AN ELECTRONIC COPY OF ALL PLANS.
  
 C) PLEASE NOTE THAT RE-SUBMITTALS MAY BE SUBJECT TO
 ADDITIONAL COMMENTS.
  
 D) IF NO RESPONSE IS RECEIVED WITHIN 60 DAYS OF THE
 ISSUANCE OF THESE COMMENTS, THE APPLICATION WILL BE
 CONSIDERED WITHDRAWN AND ANY FURTHER ACTION WILL
 REQUIRE SUBMISSION OF A NEW DEVELOPMENT APPLICATION.
  
 E) PLEASE NOTE THAT YOU WILL BE PERMITTED ONE (1)
 RESUBMITTAL AT NO ADDITIONAL COST. IF PREVIOUSLY-ISSUED
 COMMENTS CONTINUE TO NOT BE SUFFICIENTLY ADDRESSED, THE
 APPLICANT WILL BE ACCESSED A RESUBMITTAL FEE. SUCH FEE
 WILL BE 20% OF THE ORIGINAL APPLICATION FEE.
  
 F) IN ORDER TO BE CONSIDERED FOR THE FEBRUARY 18, 2020,
 PLANNING BOARD AGENDA, ALL COMMENTS SHALL BE
 SATISFACTORILY ADDRESSED. PLEASE SUBMIT ALL REVISED
 DOCUMENTS/PLANS NO LATER THAN JANUARY 10, 2020.
  
 G) TO BE PLACED ON THE FEBRUARY 18, 2020, PLANNING
 BOARD AGENDA, SIGNS SHALL BE POSTED ON THE PROPERTY NO
 LATER THAN FEBRUARY 3, 2020. SIGNAGE SHALL CONFORM, AND
 BE INSTALLED ACCORDING TO THE REQUIREMENTS OF THE
 CITY?S ZONING AND LAND DEVELOPMENT REGULATIONS; SUCH
 REQUIREMENTS ARE ALSO PROVIDED IN THE DEVELOPMENT
 APPLICATION. A SIGNED AND NOTARIZED AFFIDAVIT SHALL BE
 PROVIDED BY THE DEADLINE REFERENCED ABOVE.
  
 H) IF AFTER THE CASE HAS BEEN ADVERTISED THE APPLICANT
 DESIRES TO REQUEST A CONTINUANCE, A FEE OF $50 PLUS THE
 COST OF ADVERTISING WILL BE CHARGED.
 ________________________________________
  
 QUESTIONS/COMMENTS, PLEASE CONTACT THE FOLLOWING:
  
 JOHN P. ROACH, AICP, PRINCIPAL PLANNER
 CITY OF WEST PALM BEACH
 DEVELOPMENT SERVICES DEPARTMENT ? PLANNING DIVISION
 401 CLEMATIS STREET - P.O. BOX 3147
 WEST PALM BEACH, FLORIDA 33402
  
 P: 561.822.1448
 TTY: 800.955.8771
 E: [email protected]
  
 W: WPB.ORG
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved