2019-10-08 16:49:08THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. ADD THE CONVERSION EQUATION BETWEEN NAVD1988 AND
 NGVD1929 VERTICAL DATUMS TO THE SURVEY AND ENGINEERING
 PLANS.
  
 2. POLLUTANT RETARDANT BAFFLES (PRB'S) SHOULD BE USED
 IN ALL DRAINAGE STRUCTURES CONNECTED TO EXFILTRATION
 TRENCH.
  
 3. IDENTIFY WHICH DRAINAGE STRUCTURE WILL BE THE
 CONTROL STRUCTURE.
  
 4. DRAINAGE EASEMENT SHOLD BE OBTAINED FOR OUTFALL PIPE
 CROSSING THE APARTMENTS? PARCEL.
  
 5. SHOW AND LABEL THE PERIMETER BERM ALONG THE PROPERTY
 BOUNDARIES. PROVIDE A CROSS SECTION DETAIL OF THE
 PERIMETER BERM.
  
 6. PROVIDE GRADING, CONTOURS AND/OR CROSS SECTION(S) OF
 THE PERVIOUS AREA NEAR STRUCTURE S-7.
  
 7. PROVIDE CROSS SECTION(S) OR GRADING/CONTOURS OF THE
 PROPOSED DETENTION AREA.
  
 8. LIST VERTICAL DATUM AND CONVERSION EQUATION ON EACH
 SHEET CONTAINING ELEVATION INFORMATION.
  
 9. CLARIFY THE MINIMUM BERM ELEVATION INFORMATION IN
 THE TABLE ON SHEET C-140.
  
 10. SHOW MILL AND RESURFACE LIMITS FOR THE TRENCH CUTS
 ON VILLAGE BLVD.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved