| 2019-10-08 16:49:08 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. ADD THE CONVERSION EQUATION BETWEEN NAVD1988 AND |
| | NGVD1929 VERTICAL DATUMS TO THE SURVEY AND ENGINEERING |
| | PLANS. |
| | |
| | 2. POLLUTANT RETARDANT BAFFLES (PRB'S) SHOULD BE USED |
| | IN ALL DRAINAGE STRUCTURES CONNECTED TO EXFILTRATION |
| | TRENCH. |
| | |
| | 3. IDENTIFY WHICH DRAINAGE STRUCTURE WILL BE THE |
| | CONTROL STRUCTURE. |
| | |
| | 4. DRAINAGE EASEMENT SHOLD BE OBTAINED FOR OUTFALL PIPE |
| | CROSSING THE APARTMENTS? PARCEL. |
| | |
| | 5. SHOW AND LABEL THE PERIMETER BERM ALONG THE PROPERTY |
| | BOUNDARIES. PROVIDE A CROSS SECTION DETAIL OF THE |
| | PERIMETER BERM. |
| | |
| | 6. PROVIDE GRADING, CONTOURS AND/OR CROSS SECTION(S) OF |
| | THE PERVIOUS AREA NEAR STRUCTURE S-7. |
| | |
| | 7. PROVIDE CROSS SECTION(S) OR GRADING/CONTOURS OF THE |
| | PROPOSED DETENTION AREA. |
| | |
| | 8. LIST VERTICAL DATUM AND CONVERSION EQUATION ON EACH |
| | SHEET CONTAINING ELEVATION INFORMATION. |
| | |
| | 9. CLARIFY THE MINIMUM BERM ELEVATION INFORMATION IN |
| | THE TABLE ON SHEET C-140. |
| | |
| | 10. SHOW MILL AND RESURFACE LIMITS FOR THE TRENCH CUTS |
| | ON VILLAGE BLVD. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |