Date Text
2019-10-07 11:58:241. THE CITY OF WEST PALM BEACH HAS A NUMBER OF
 REGULATIONS AND PERMIT REQUIREMENTS WHICH DIRECTLY
 AFFECT THE DEVELOPMENT AND INSTALLATION OF WATER AND
 WASTEWATER UTILITIES WITHIN THE CITY. PLEASE SEE
 DEVELOPMENT PERMIT SUBMITTAL REQUIREMENTS AT THE LINK
 BELOW: HTTP://WPB.ORG/CMSPAGES/GETAMAZONFILE.ASPX?PATH=
 ~\WPB_WEBSITE\MEDIA\ENGINEERING\DEVELOPMENT-APPLICATION
 -FULL-PACKAGE_2016.PDF&HASH=7BD4DD7EB6115181D8C5977BCC0
 2A97B1960045731D3658206F27451722716EF
 THIS AND OTHER RELATED ENGINEERING DOCUMENTS CAN BE
 FOUND HERE: HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBL
 IC-WORKS/FORMS,-PERMITS-APPLICATIONS
 2. CODE OF ORDINANCES, CITY OF WEST PALM BEACH,
 FLORIDA, CODIFIED THROUGH ORD. NO. 4183-08, ADOPTED
 SEPT. 22, 2008. (SUPPLEMENT NO. 18)
 CHAPTER 90 UTILITIES, ARTICLE I. SEC. 90-7.
 POLICY REGARDING EXTENSION OF WATER OR SEWER SERVICE
 FACILITIES OF THE CITY.
 THE WATER AND WASTEWATER SERVICE AGREEMENTS AND THE
 CONSTRUCTION PERMITS ADDRESS RESERVATION OF CAPACITY
 BASED ON USAGE, METER SIZE AND FEES, DESIGN STANDARDS,
 BACKFLOW PREVENTION, FIRE SERVICE AND IRRIGATION.
 3. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 4. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORMWATER, AND SANITARY AND SEWER LINES,
 INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER AND
 SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND
 PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER
 OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS.
 5. CUT AND CAP UTILITIES NOT IN USE, AND REMOVE ANY
 ABANDONED UTILITY LINES LARGER THAN 2 INCHES FROM CITY
 RIGHT OF WAY.
 6. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 7. PROVIDE CALCULATIONS ON PLANS OF EXISTING AND
 PROPOSED DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM
 AND PEAK) AND FIRE FLOW DEMANDS. CALCULATIONS SHALL BE
 PER FAC 64E-6 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 8. SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29) ON ALL SHEETS.
 9. PLEASE PROVIDE CALCULATIONS OF EXISTING AND REVISED
 PERVIOUS AND IMPERVIOUS CALCULATIONS FOR THE PROPOSED
 IMPACTED AREAS.
 10. PROVIDE ONSITE CLEANOUTS NEAR PROPERTY LINE FOR
 PROPOSED SANITARY LATERALS.
 11. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE
 SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING
 PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT
 HIM AT 561-494-2262 OR [email protected]
 12. PROVIDE UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY
 PERSONNEL TO PROPOSED UTILITIES INCLUDING WATER METERS.
 13. PLEASE PROVIDE 10 FT. MIN. HORIZONTAL CLEARANCE
 BETWEEN PROPOSED WATER AND SEWER LINES.
 14. PLEASE SHOW 10 IN. X 6 IN. TAP AT POINT OF SERVICE
 (NO REDUCER).
 15. PLEASE SHOW SLOPE % ON ALL SANITARY LINES AND CALL
 OUT MATERIAL.
 16. PLEASE PROVIDE INLET ELEVATIONS AT PROPOSED
 MANHOLES.
 17. SPECIFY WATER MAIN IN RIGHT OF WAY AS 6 IN. DIP
 MATERIAL.
 18. PLEASE SHOW VALVE SIZES AND LOCATIONS. LABEL CITY
 POINT OF SERVICE.
 19. LABEL WATER LINES AS ?PRIVATE? WHERE APPLICABLE.
 20. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 21. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE CALLOUT
 DOMESTIC BACKFLOW PREVENTER AS RPPA AND FIRE BACKFLOW
 PREVENTER AS DCDA.
 22. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 23. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 24. FOR FORMAL ENGINEERING SUBMITTAL PROVIDE SANITARY
 ELEVATIONS AT MANHOLE TIE-IN.
 25. FOR FORMAL ENGINEERING SUBMITTAL, IF SANITARY LINES
 ARE PROPOSED IN ROW PLEASE SHOW ADJACENT SANITARY
 LATERAL LOCATIONS AND SHOW ADDRESSES OF ADJACENT
 PARCELS.
 26. FOR FORMAL ENGINEERING SUBMITTAL, IF WATER LINES
 ARE BEING REPLACED IN ROW, SHOW ADJACENT PARCEL
 ADDRESSES.
 27. FOR FORMAL ENGINEERING SUBMITTAL, WHEN TRENCHING IN
 IN CITY MAINTAINED ROADWAY AREAS ADD NOTE TO PROVIDE 50
 FT. PAVEMENT RESTORATION TRANSITION ON EACH SIDE OF
 PROPOSED TRENCH PER CITY OF WPB STANDARD DETAIL GC-9.
 28. PLEASE RESPOND TO ALL COMMENTS IN WRITING.
  
 -----------------------------
  
 PLEASE SEE ADDITIONAL COMMENTS FROM MARK HURLEY,
 CUSTOMER SERVICE SUPERVISOR CITY OF WPB UTILITIES:
  
 FAMILY CHURCH OFF VILLAGE (SHEET C-150)
 - PROP DDCV SHOULD BE LABELED WITH CORRECT WS SD #
 A.) SIZE OF DDCV SHOULD BE LABELED
 B.) NEED CITY POINT OF SERVICE VALVE ADDED IN THE 12?
 U.E BEFORE/UPSTREAM OF DDCV.
 C.) MATERIAL OF 6 IN. WATER MAIN NEEDS TO BE ADDED TO
 LABEL (DIP, ETC..).
 D.) EXISTING DDCV TO WEST WOULD HAVE TO BE UPGRADED TO
 COMPLIANT ASSEMBLY IF NOT ALREADY -> FIELD CUSTOMER
 SERVICE WOULD HAVE TO FIELD VERIFY. SIZE ALSO NEEDS
 LABELING.
 E.) WATER LINE FEEDING EXISTING FIRE HYDRANT NEEDS TO
 BE LABELED WITH SIZE.
  
 - IS THERE A FIRE FDC ON FIRELINE? DO NOT SEE ONE ON
 PLAN. DOES IT NEED ONE? (VERIFY WITH FIRE DEPT.)
  
 - NEED TO SHOW LOCATION AND SIZE OF EXISTING DOMESTIC
 WATER METER & BACKFLOW PREVENTERS.
 A.) PLAN DOES NOT MAKE SENSE- HOW WAS EXISTING 2 IN.
 DOMESTIC SERVICE FED AT BUILDING- PLAN DOES NOT SHOW
 ANY PIPING TO BE REMOVED ON UTILITY PLAN.
  
 - SHOW 6 IN. PVC FIRE PIPE TO THE EAST THAT IS BEING
 REMOVED ON THE UTILITY PLAN.
  
 MR. HURLEY CAN BE REACHED AT 561-494-2262 OR
 [email protected]
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
  
 RICK ROSSANO, PROJECT COORDINATOR, ENGINEERING SERVICES
 DEPARTMENT
 DIRECT: (561) 494-1098 [email protected]
  
  
  
  
  