Plan Review Notes
Plan Review Notes For Project Z19090009
Project Number Z19090009
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-10-08 16:44:30THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT HTTP://
 WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FORMS,-PER
 MITS-APPLICATIONS
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. IT APPEARS THE DRIVEWAY CONNECTION AND CONVERTING AN
 INLET TO A MANHOLE WILL AFFECT DRAINAGE ALONG THE
 COMMON PARCEL LINE.
  
 2. THE SURFACE WATER MANAGEMENT SYSTEM NEEDS TO BE
 DESIGNED TO CURRENT SFWMD CRITERIA. PROVIDE
 CALCULATIONS SIGNED AND SEALED BY A PROFESSIONAL
 ENGINEER SHOWING HOW THE PEAK STAGES AND PEAK
 DISCHARGES ARE NOT AFFECTED BY THE FILLING OF THE LAKE
 FOR THE AUDITORIUM BUILDING AND THE ADDITIONAL
 IMPERVIOUS AREA.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION PRIOR
 TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved