| Plan Review Notes For Project Z19090006 |
| Project Number |
Z19090006 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
5 |
|
| Notes |
| Date |
Text |
| 2020-02-19 10:32:58 | (REVISED COMMENTS PER DISCUSSION AND REVISED TRAFFIC | | | STUDY) | | | | | | PASSED WITH THE FOLLOWING CONDITIONS: | | | | | | 1. PROVIDE A BUS SHELTER ON DIXIE HIGHWAY. | | | 2. PROVIDE MEDIAN FOR SAFETY AT MONCEAUX ROAD AND THE | | | RAILROAD TRACK CROSSING DURING TO INCREASED TRAFFIC PER | | | THE TRAFFIC STUDY. | | | 3. PROVIDE THE FOLLOWING TRANSPORTATION DEMAND | | | MANAGEMENT (TDM) MEASURES AS INDICATED IN THE SUBMITTED | | | TDM PLAN AND OTHER TDM MEASURES TO MITIGATE TRAFFIC | | | IMPACT. AVAILABLE DATA FROM THESE TDM MEASURES SHOULD | | | BE PROVIDED TO THE CITY ANNUALLY. | | | A. IMPLEMENT ?PREFERRED PARKING? PROGRAM FOR CARPOOLERS | | | WITH A MINIMUM OF 5 SPACES. | | | B. RESERVE SPACE FOR FUTURE MICROMOBILITY FACILITIES TO | | | BE LOCATED EAST OF THE RAILROAD TRACK. | | | C. EXPLORE OPTION TO PROVIDE MICRO-TRANSIT TO THE SITE. | | | 4. MODIFY THE SITE PLAN TO MAINTAIN SIDEWALK LEVEL | | | ACROSS ALL DRIVEWAYS DURING PERMITTING. | | | 5. PROVIDE 10-FOOT SIDEWALK ALONG SITE FRONTAGE ON | | | BELVEDERE ROAD. | | | 6. CLOSE THE PRIVATE RAILROAD CROSSING AND PROVIDE | | | PEDESTRIAN BRIDGE ACROSS THE PRIVATE RAILROAD CROSSING. | | | MODIFY THE SITE PLAN ASSOCIATED WITH THE RAILROAD | | | CROSSING CLOSURE. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| |
Print |
|