2020-02-12 09:41:29TRAFFIC STUDY COMMENTS:
 1. THE RESULTS IN TABLE 10 ARE NOT CONSISTENT WITH THE
 HCS ANALYSES. PLEASE VERIFY AND REVISE. PLEASE PROVIDE
 MITIGATION MEASURES AS SIGNIFICANT HIGH DELAY ON THE
 MINOR MOVEMENTS MAY INTRODUCE POTENTIALLY UNSAFE
 DRIVING BEHAVIOR IMPACTING PUBLIC SAFETY ON DIXIE
 HIGHWAY.
 CONDITIONS:
 1. PROVIDE A BUS SHELTER ON DIXIE HIGHWAY FOLLOWING THE
 CITY?S BUS SHELTER DESIGN IF THE BUS SHELTER IS NOT
 DESIGNED BY AN ARTIST.
 2. PROVIDE MEDIAN OR QUAD GATES AND STREET LIGHTING FOR
 SAFETY AT MONCEAUX ROAD AND THE RAILROAD TRACK
 CROSSING.
 3. MILL AND RESURFACE MONCEAUX ROAD FROM SOUTH DIXIE
 HIGHWAY TO GEORGIA AVENUE PRIOR TO THE ISSUANCE OF THE
 FIRST CERTIFICATE OF OCCUPANCY.
 4. PROVIDE THE FOLLOWING TRANSPORTATION DEMAND
 MANAGEMENT (TDM) MEASURES AS INDICATED IN THE SUBMITTED
 TDM PLAN AND OTHER TDM MEASURES TO MITIGATE TRAFFIC
 IMPACT. MONITORING OF THESE TDM MEASURES SHOULD BE
 PROVIDED TO THE CITY ANNUALLY.
 A. PROVIDE SHOWER AND LOCKER FACILITY ON-SITE FOR ALL
 EMPLOYEES.
 B. IMPLEMENT ?PREFERRED PARKING? PROGRAM FOR
 CARPOOLERS.
 C. PROVIDE FREE TRANSIT PASS TO EMPLOYEES.
 D. RESERVE SPACE FOR FUTURE MICROMOBILITY FACILITIES.
 E. MAKE CONTRIBUTION TO CITY?S TRANSIT OPERATING FUND
 INSTEAD OF PROVIDING PRIVATE SHUTTLE SERVICES
 5. MAINTAIN GENERAL PUBLIC ACCESS TO AND PARKING ON THE
 PARKING LOT.
 6. MAINTAIN SIDEWALK LEVEL ACROSS ALL DRIVEWAYS.
 7. PROVIDE 10-FOOT SIDEWALK ALONG SITE FRONTAGE ON
 BELVEDERE ROAD.
  
  
 SHING TSOI
 CITY IN-HOUSE TRAFFIC CONSULTANT
 561-494-1141
 [email protected]
 (IN-HOUSE ON TUESDAYS AND WEDNESDAYS)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved