| Date |
Text |
| 2020-02-12 09:41:29 | TRAFFIC STUDY COMMENTS: |
| | 1. THE RESULTS IN TABLE 10 ARE NOT CONSISTENT WITH THE |
| | HCS ANALYSES. PLEASE VERIFY AND REVISE. PLEASE PROVIDE |
| | MITIGATION MEASURES AS SIGNIFICANT HIGH DELAY ON THE |
| | MINOR MOVEMENTS MAY INTRODUCE POTENTIALLY UNSAFE |
| | DRIVING BEHAVIOR IMPACTING PUBLIC SAFETY ON DIXIE |
| | HIGHWAY. |
| | CONDITIONS: |
| | 1. PROVIDE A BUS SHELTER ON DIXIE HIGHWAY FOLLOWING THE |
| | CITY?S BUS SHELTER DESIGN IF THE BUS SHELTER IS NOT |
| | DESIGNED BY AN ARTIST. |
| | 2. PROVIDE MEDIAN OR QUAD GATES AND STREET LIGHTING FOR |
| | SAFETY AT MONCEAUX ROAD AND THE RAILROAD TRACK |
| | CROSSING. |
| | 3. MILL AND RESURFACE MONCEAUX ROAD FROM SOUTH DIXIE |
| | HIGHWAY TO GEORGIA AVENUE PRIOR TO THE ISSUANCE OF THE |
| | FIRST CERTIFICATE OF OCCUPANCY. |
| | 4. PROVIDE THE FOLLOWING TRANSPORTATION DEMAND |
| | MANAGEMENT (TDM) MEASURES AS INDICATED IN THE SUBMITTED |
| | TDM PLAN AND OTHER TDM MEASURES TO MITIGATE TRAFFIC |
| | IMPACT. MONITORING OF THESE TDM MEASURES SHOULD BE |
| | PROVIDED TO THE CITY ANNUALLY. |
| | A. PROVIDE SHOWER AND LOCKER FACILITY ON-SITE FOR ALL |
| | EMPLOYEES. |
| | B. IMPLEMENT ?PREFERRED PARKING? PROGRAM FOR |
| | CARPOOLERS. |
| | C. PROVIDE FREE TRANSIT PASS TO EMPLOYEES. |
| | D. RESERVE SPACE FOR FUTURE MICROMOBILITY FACILITIES. |
| | E. MAKE CONTRIBUTION TO CITY?S TRANSIT OPERATING FUND |
| | INSTEAD OF PROVIDING PRIVATE SHUTTLE SERVICES |
| | 5. MAINTAIN GENERAL PUBLIC ACCESS TO AND PARKING ON THE |
| | PARKING LOT. |
| | 6. MAINTAIN SIDEWALK LEVEL ACROSS ALL DRIVEWAYS. |
| | 7. PROVIDE 10-FOOT SIDEWALK ALONG SITE FRONTAGE ON |
| | BELVEDERE ROAD. |
| | |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| | |
| |
Print |