| Plan Review Notes For Project Z19090006 |
| Project Number |
Z19090006 |
|
| Review Stop |
PW |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2019-10-09 10:47:53 | PROPOSED LOCATION FOR THE DUMPSTER ENCLOSURE, AS | | | PRESENTED ON SP-1, FOR BOTH LOCATIONS (BLDG. #2 AND | | | BLDG. #1 IS NOT FEASIBLE FOR THE FRONT LOADER | | | SANITATION TRUCK TO ACCESS AND SERVICE SAFELY. PLEASE | | | CONSIDER THE FOLLOWINGS: | | | O RELOCATION OF THE DUMPSTER ENCLOSURES | | | O REORIENTATION OF THE DUMPSTER ENCLOSURE | | | | | | MATT HEJAZI | | | DEPT. OF PUBLIC WORKS | | | [email protected] | | | 561-822-2045 | | | |
| |
Print |
|