2020-05-27 11:49:46FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462
 PROJECT: 3404 BROADWAY MIXED USE Z19080025
 MAY 27, 2020
 I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND
 PROVIDE THE FOLLOWING COMMENTS:
  
 1. SATISFIED. THE APPLICANT MAY DO A COMPREHENSIVE
 LANDSCAPE PLAN FOR THE ENTIRE SITE AND PROVIDE A
 PHASING PLAN OR PROVIDE TWO SEPARATE LANDSCAPE PLANS,
 ONE FOR EACH PHASE. ALL PLANS MUST MEET THE
 REQUIREMENTS.
  
 2. PROVIDE A TREE SURVEY AND DISPOSITION CHART OF THE
 TREES WITHIN THE AFFECTED AREA AND INDICATE IF THEY
 WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. LIST
 THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER.
 CALCULATE THE REQUIRED MITIGATION IN SQUARE FOOTAGE.
 ? SATISFIED. SHOW CALCULATIONS FOR CANOPY SQUARE
 FOOTAGE BASED ON DIAMETER, 1:1 SAME CATEGORY IF UNDER
 20 FEET, ACTUAL AREA 20 FEET OR MORE WITHIN THE
 DISPOSITION CHART.
 SOLITAIRE PALMS ARE 50 SQ FT EACH, FICUS TREES ARE 717
 SQ FT EACH, ARECAS 50 SQ FT EACH, #12 SAPOTE (NOT BLACK
 OLIVE) IS 314 SQ FT. IF THE 4 SABAL PALMS ARE IN GOOD
 CONDITION, THEY MUST BE RELOCATED.
 ? SATISFIED. ADD THE SUM OF ALL TREE CANOPY MITIGATION
 TO SHOW THE TOTAL MITIGATION DUE.
 TOTAL MITIGATION DUE WILL BE 2698 SQ FT WITH 4 SABALS
 BEING RELOCATED.
 ? NOT SATISFIED. SHOW THE MITIGATION PROVIDED
 CALCULATION FOR ALL TREES AND PALMS PROPOSED WITH THE
 LANDSCAPE PLAN.
 SHOW TOTALS FOR PHASE 1 AND 2 BASED ON MITIGATION
 CREDITS BY CATEGORY.
  
 3. PARTIALLY SATISFIED. PROVIDE THE FLORIDA FRIENDLY
 LANDSCAPE DESIGN OPTIONS CHART SECTION 94-446 (G) AND
 PROVIDE THE REQUIRED 50 POINTS.
 MAKE ALL CORRECTIONS TO PLANT LIST FOR COMMENTS AND
 RECALCULATE POINTS BASED ON PLANT LIST FOR BOTH PHASES.
  
 4. PARTIALLY SATISFIED. PROVIDE A PLAN SHOWING THE
 PARKING LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH
 SECTION 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS.
 CALCULATE SQUARE FOOTAGE REQUIRED PER CODES REFERENCED
 AND SHOW WHERE IT IS PROVIDED WITHIN THE PARKING AREA
 FOR BOTH PHASES.
  
 5. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR
 REQUIRED BUFFER TREES AT ONE FOR EVERY 30 FEET OR
 PORTION THEREOF FOR ALL BUFFER LENGTHS, AND SHOW THE
 NUMBER PROVIDED.
 PROVIDE CALCULATIONS FOR EAST BUFFER ON PHASE 1.
 PROVIDE CALCULATIONS FOR EAST AND NORTH BUFFER FOR
 PHASE 2.
 THIS COMMENT WAS FOR MISSING BUFFER INFORMATION ON THE
 FIRST REVIEW. BUFFER CALCULATIONS ARE TO BE SUPPLIED
 FOR 3 SIDES ON PHASE 1, AND 3 SIDES ON PHASE 2.
  
 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 10 FOOT
 LANDSCAPE BUFFERS ON THE BROADWAY AND 33RD STREET SIDES
 OF THE PROJECT PER SECTION 94-443(D). SHOW THE BUFFER
 WIDTH PROVIDED ON THE EAST PROPERTY LINE.
  
 7. SATISFIED. PROVIDE THE REQUIRED BUFFER TREES WITHIN
 THE PROPERTY LINE OF THE PROJECT. TREES MAY BE PLACED
 ANYWHERE WITHIN THE AREA BETWEEN THE PROPERTY LINE AND
 BUILDING. SHRUBS MAY BE PLACED BETWEEN THE CURB AND
 SIDEWALK AS PART OF ROADWAY BEAUTIFICATION TO SEPARATE
 THE PUBLIC OPEN SPACE AREAS FROM TRAFFIC.
  
 8. SATISFIED. PROVIDE HEDGES TO SCREEN ALL PARKING
 AREAS FROM ADJACENT PROPERTIES AND STREETS.
  
  
 9. PARTIALLY SATISFIED. MULTIFAMILY REQUIREMENTS OF
 SECTION 94-443(D) SHALL APPLY FOR THE ADDITIONAL TREES
 REQUIRED AT ONE PER UNIT ADDED TO THE OVERALL SHADE
 TREE AND FLOWERING TREE REQUIREMENT. SHOW TOTAL
 REQUIRED AND PROVIDED.
 CALCULATE THE TREE (1/1500), FLOWERING TREE (1 /6000)
 AND SHRUB (1/500) COUNTS BASED ON THE OPEN SPACE SQUARE
 FOOTAGE PROVIDED FOR EACH PHASE PER SECTION 94-442(C),
 THEN ADD THE ADDITIONAL TREES PER UNIT FOR BOTH PHASES.
 SHOW THE ADDITIONAL TREES PER UNIT.
  
  
 10. SATISFIED. SHOW LINEAR FOOTAGE OF LANDSCAPED AREA
 ADJACENT TO THE BUILDING MEETS THE REQUIREMENT OF 40
 PERCENT PER SECTION 94-443(D)(2) B.
 PROVIDE CALCULATIONS FOR BUILDING PERIMETER, REQUIRED
 AND PROVIDED LINEAR FEET OF LANDSCAPED AREA FOR
 BUILDINGS IN BOTH PHASES.
  
  
 11. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION
 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF
 PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT
 TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE
 LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH
 FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH
 FLORIDA LANDSCAPES.
 PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST.
 PROVIDE THE PERCENTAGE AFTER ADJUSTMENTS FOR NATIVE
 PLANTS ON PLANT LIST PER COMMENT 16.
 MUST SHOW TOTAL PERCENTAGE FOR NATIVE AND DROUGHT
 TOLERANT SPECIES AS A PERCENTAGE OF THE TOTAL ADDED
 PLANTS.
  
  
  
 12. PARTIALLY SATISFIED. SHOW LOCATIONS OF FPL
 TRANSFORMERS ON THE LANDSCAPE PLAN AND RESOLVE
 CONFLICTS WITH LANDSCAPING.
 THE REASON TO FIND OUT THE LOCATION IS TO AVOID
 PLACEMENT OF THE TRANSFORMER IN LANDSCAPE ISLANDS THAT
 WOULD DISPLACE THE TREE REQUIRED BY CODE. THIS NEEDS TO
 BE CLEAR FOR THE APPROVAL OF THE SITE AND LANDSCAPE
 PLANS.
 TRANSFORMER LOCATION IS SHOWN BUT WILL RESTRICT THE
 PLANTING OF THE REQUIRED TREE.
  
 13. PARTIALLY SATISFIED. PROVIDE A DETAIL AND LOCATIONS
 OF ROOT BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY
 LINES.
 DRAINAGE, WATER AND SEWER LINES NEED TO BE SHOWN ON THE
 LANDSCAPE PLAN. THERE ARE MULTIPLE CONFLICTS BETWEEN
 REQUIRED TREES AND UTILITIES. THERE NEEDS TO BE
 COORDINATION BETWEEN THE ENGINEER AND LANDSCAPE
 ARCHITECT TO CORRECT THESE CONFLICTS.
  
  
 14. NOT SATISFIED. PROVIDE SCREENING FOR ALL GROUND
 MOUNTED VALVES AND EQUIPMENT.
 ALL UTILITY VALVES, FIRE LINES, A/C UNITS, ETC. NEED TO
 BE SHOWN AND SCREENING HEDGES PROVIDED.
  
  
 15. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF ALL SITE
 LIGHTING ON THE LANDSCAPE PLAN AND RESOLVE ANY
 CONFLICTS WITH TREES.
 LIGHTING LOCATIONS ARE SHOWN ON THE LANDSCAPE PLAN TO
 AVOID CONFLICTS WITH REQUIRED TREES, BUT SITE PLAN AND
 ENGINEERING PLANS SHOW THE LIGHT POLES IN LANDSCAPE
 ISLANDS IN CONFLICT WITH REQUIRED TREES.
 ADDITIONAL COMMENTS 3/3/20:
 16. SATISFIED. SHORE JUNIPER AND VIBURNUM SUSPENSUM ARE
 NOT FLORIDA NATIVE PLANTS. THEY ARE NATIVE TO JAPAN.
  
 17. NOT SATISFIED. PHASE 1 PLAN DOES NOT MEET THE
 REQUIREMENT FOR 75% OF THE REQUIRED PARKING LOT TREES
 TO BE CATEGORY 1 TREES SUCH AS LIVE OAK TO PROVIDE
 SHADE FOR THE PARKING SPACES PER SECTION 94-443 (C)(3).
  
 18. NOT SATISFIED. PHASE 2 PLAN IS MISSING REQUIRED
 TREES IN TERMINAL LANDSCAPE ISLANDS AND DOES NOT MEET
 THE REQUIREMENT FOR 75% OF THE REQUIRED PARKING LOT
 TREES TO BE CATEGORY 1 TREES SUCH AS LIVE OAK TO
 PROVIDE SHADE FOR THE PARKING SPACES.
  
 ADDITIONAL COMMENTS 5/27/20:
 19. ALL TERMINAL ISLANDS MUST BE PROVIDED AT THE END OF
 EACH ROW OF PARKING AS REQUIRED, AND THE 8 FOOT WIDTH
 INSIDE THE CURB MUST BE PROVIDED. IF THE TERMINAL
 ISLAND IS ADJACENT TO A 5 FOOT LANDSCAPE BUFFER, THE
 ADDITIONAL 3 FEET MUST BE PROVIDED TO ACHIEVE THE 8
 FEET WIDTH.
 CONDITIONS OF APPROVAL
 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON
 THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE
 SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT
 SERVICES DEPARTMENT, PLANNING DIVISION.
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved