| Plan Review Notes For Project Z19080025 |
| Project Number |
Z19080025 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2020-02-26 13:36:10 | TRAFFIC STUDY COMMENTS: | | | 1. PROVIDE COUNTY TPS LETTER. | | | 2. CONTRARY TO THE STATEMENT INDICATED ON PAGE 1 OF THE | | | TRAFFIC STUDY, THE PROJECT SITE IS NOT LOCATED WITHIN | | | THE TCEA. PLEASE REVISE. | | | 3. PLEASE INCLUDE COMMITTED TRIPS FROM THE COUNTY'S TPS | | | DATABASE IN THE ANALYSIS. | | | 4. THE SITE PLAN IS DIFFERENT THAN THE DESCRIPTION | | | PROVIDED ON PAGE 14 OF THE TRAFFIC STUDY. PLEASE VERIFY | | | AND REVISE. | | | | | | SITE PLAN COMMENTS: | | | 5. PROVIDE A BUS STOP EASEMENT WITHIN THE PROPERTY NEAR | | | THE CORNER COFFEE SHOP FOR FUTURE BUS STOP. | | | 6. REPAVING BOTH SIDES OF 33RD STREET AND THE ALLEY FOR | | | 50 FEET ON EITHER SIDE OF THE UNDERGROUND UTILITY | | | TIE-IN POINTS WILL BE REQUIRED PER ENGINEERING | | | STANDARD. | | | 7. PROVIDE AUTOTURN PATHS FOR GARBAGE PICK-UP. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) | | | |
| |
Print |
|