| 2020-03-03 15:34:52 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 |
| | PROJECT: 3404 BROADWAY MIXED USE Z19080025 |
| | MARCH 3, 2020 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. SATISFIED. THE APPLICANT MAY DO A COMPREHENSIVE |
| | LANDSCAPE PLAN FOR THE ENTIRE SITE AND PROVIDE A |
| | PHASING PLAN OR PROVIDE TWO SEPARATE LANDSCAPE PLANS, |
| | ONE FOR EACH PHASE. ALL PLANS MUST MEET THE |
| | REQUIREMENTS. |
| | |
| | 2. PROVIDE A TREE SURVEY AND DISPOSITION CHART OF THE |
| | TREES WITHIN THE AFFECTED AREA AND INDICATE IF THEY |
| | WILL BE PRESERVED IN PLACE, RELOCATED OR REMOVED. LIST |
| | THE BOTANICAL NAME AND PROVIDE THE CANOPY DIAMETER. |
| | CALCULATE THE REQUIRED MITIGATION IN SQUARE FOOTAGE. |
| | ? NOT SATISFIED. SHOW CALCULATIONS FOR CANOPY SQUARE |
| | FOOTAGE BASED ON DIAMETER, 1:1 SAME CATEGORY IF UNDER |
| | 20 FEET, ACTUAL AREA 20 FEET OR MORE WITHIN THE |
| | DISPOSITION CHART. |
| | SOLITAIRE PALMS ARE 50 SQ FT EACH, FICUS TREES ARE 717 |
| | SQ FT EACH, ARECAS 50 SQ FT EACH, #12 SAPOTE (NOT BLACK |
| | OLIVE) IS 314 SQ FT. IF THE 4 SABAL PALMS ARE IN GOOD |
| | CONDITION, THEY MUST BE RELOCATED. |
| | ? PARTIALLY SATISFIED. ADD THE SUM OF ALL TREE CANOPY |
| | MITIGATION TO SHOW THE TOTAL MITIGATION DUE. |
| | TOTAL MITIGATION DUE WILL BE 2698 SQ FT WITH 4 SABALS |
| | BEING RELOCATED. |
| | ? NOT SATISFIED. SHOW THE MITIGATION PROVIDED |
| | CALCULATION FOR ALL TREES AND PALMS PROPOSED WITH THE |
| | LANDSCAPE PLAN. |
| | SHOW TOTALS FOR PHASE 1 AND 2 BASED ON MITIGATION |
| | CREDITS BY CATEGORY. |
| | |
| | 3. PARTIALLY SATISFIED. PROVIDE THE FLORIDA FRIENDLY |
| | LANDSCAPE DESIGN OPTIONS CHART SECTION 94-446 (G) AND |
| | PROVIDE THE REQUIRED 50 POINTS. |
| | MAKE ALL CORRECTIONS TO PLANT LIST FOR COMMENTS AND |
| | RECALCULATE POINTS BASED ON PLANT LIST FOR BOTH PHASES. |
| | |
| | 4. NOT SATISFIED. PROVIDE A PLAN SHOWING THE PARKING |
| | LANDSCAPE AREAS COUNTED TOWARD COMPLIANCE WITH SECTION |
| | 94-443(C)(3) AND (4) AND PROVIDE CALCULATIONS. |
| | CALCULATE SQUARE FOOTAGE REQUIRED PER CODES REFERENCED |
| | AND SHOW WHERE IT IS PROVIDED WITHIN THE PARKING AREA |
| | FOR BOTH PHASES. |
| | |
| | 5. PARTIALLY SATISFIED. PROVIDE CALCULATIONS FOR |
| | REQUIRED BUFFER TREES AT ONE FOR EVERY 30 FEET OR |
| | PORTION THEREOF FOR ALL BUFFER LENGTHS, AND SHOW THE |
| | NUMBER PROVIDED. |
| | PROVIDE CALCULATIONS FOR EAST BUFFER ON PHASE 1. |
| | PROVIDE CALCULATIONS FOR EAST AND NORTH BUFFER FOR |
| | PHASE 2. |
| | |
| | 6. SATISFIED. SHOW THE LOCATIONS OF REQUIRED 10 FOOT |
| | LANDSCAPE BUFFERS ON THE BROADWAY AND 33RD STREET SIDES |
| | OF THE PROJECT PER SECTION 94-443(D). SHOW THE BUFFER |
| | WIDTH PROVIDED ON THE EAST PROPERTY LINE. |
| | |
| | 7. SATISFIED. PROVIDE THE REQUIRED BUFFER TREES WITHIN |
| | THE PROPERTY LINE OF THE PROJECT. TREES MAY BE PLACED |
| | ANYWHERE WITHIN THE AREA BETWEEN THE PROPERTY LINE AND |
| | BUILDING. SHRUBS MAY BE PLACED BETWEEN THE CURB AND |
| | SIDEWALK AS PART OF ROADWAY BEAUTIFICATION TO SEPARATE |
| | THE PUBLIC OPEN SPACE AREAS FROM TRAFFIC. |
| | |
| | 8. SATISFIED. PROVIDE HEDGES TO SCREEN ALL PARKING |
| | AREAS FROM ADJACENT PROPERTIES AND STREETS. |
| | |
| | |
| | 9. PARTIALLY SATISFIED. MULTIFAMILY REQUIREMENTS OF |
| | SECTION 94-443(D) SHALL APPLY FOR THE ADDITIONAL TREES |
| | REQUIRED AT ONE PER UNIT ADDED TO THE OVERALL SHADE |
| | TREE AND FLOWERING TREE REQUIREMENT. SHOW TOTAL |
| | REQUIRED AND PROVIDED. |
| | CALCULATE THE TREE (1/1500), FLOWERING TREE (1 /6000) |
| | AND SHRUB (1/500) COUNTS BASED ON THE OPEN SPACE SQUARE |
| | FOOTAGE PROVIDED FOR EACH PHASE PER SECTION 94-442(C), |
| | THEN ADD THE ADDITIONAL TREES PER UNIT FOR BOTH PHASES. |
| | |
| | |
| | 10. NOT SATISFIED. SHOW LINEAR FOOTAGE OF LANDSCAPED |
| | AREA ADJACENT TO THE BUILDING MEETS THE REQUIREMENT OF |
| | 40 PERCENT PER SECTION 94-443(D)(2) B. |
| | PROVIDE CALCULATIONS FOR BUILDING PERIMETER, REQUIRED |
| | AND PROVIDED LINEAR FEET OF LANDSCAPED AREA FOR |
| | BUILDINGS IN BOTH PHASES. |
| | |
| | |
| | 11. PARTIALLY SATISFIED. SHOW COMPLIANCE WITH SECTION |
| | 94-445 L. PLANT SPECIES. A MINIMUM OF 60 PERCENT OF |
| | PLANT MATERIAL ADDED SHALL BE FLORIDA NATIVE OR DROUGHT |
| | TOLERANT SPECIES SELECTED FROM THE CITY LIST OR THE |
| | LIST OF SPECIES IN THE MOST RECENT EDITION OF SOUTH |
| | FLORIDA WATER MANAGEMENT DISTRICT WATERWISE SOUTH |
| | FLORIDA LANDSCAPES. |
| | PROVIDE THE TOTAL PERCENTAGE BASED ON FINAL PLANT LIST. |
| | PROVIDE THE PERCENTAGE AFTER ADJUSTMENTS FOR NATIVE |
| | PLANTS ON PLANT LIST PER COMMENT 16. |
| | |
| | |
| | |
| | 12. NOT SATISFIED. SHOW LOCATIONS OF FPL TRANSFORMERS |
| | ON THE LANDSCAPE PLAN AND RESOLVE CONFLICTS WITH |
| | LANDSCAPING. |
| | THE REASON TO FIND OUT THE LOCATION IS TO AVOID |
| | PLACEMENT OF THE TRANSFORMER IN LANDSCAPE ISLANDS THAT |
| | WOULD DISPLACE THE TREE REQUIRED BY CODE. THIS NEEDS TO |
| | BE CLEAR FOR THE APPROVAL OF THE SITE AND LANDSCAPE |
| | PLANS. |
| | |
| | 13. PARTIALLY SATISFIED. PROVIDE A DETAIL AND LOCATIONS |
| | OF ROOT BARRIERS TO SEPARATE LANDSCAPING FROM UTILITY |
| | LINES. |
| | DRAINAGE, WATER AND SEWER LINES NEED TO BE SHOWN ON THE |
| | LANDSCAPE PLAN. THERE ARE MULTIPLE CONFLICTS BETWEEN |
| | REQUIRED TREES AND UTILITIES. THERE NEEDS TO BE |
| | COORDINATION BETWEEN THE ENGINEER AND LANDSCAPE |
| | ARCHITECT TO CORRECT THESE CONFLICTS. |
| | |
| | 14. NOT SATISFIED. PROVIDE SCREENING FOR ALL GROUND |
| | MOUNTED VALVES AND EQUIPMENT. |
| | ALL UTILITY VALVES, FIRE LINES, A/C UNITS, ETC. NEED TO |
| | BE SHOWN AND SCREENING HEDGES PROVIDED. |
| | |
| | |
| | 15. PARTIALLY SATISFIED. SHOW THE LOCATIONS OF ALL SITE |
| | LIGHTING ON THE LANDSCAPE PLAN AND RESOLVE ANY |
| | CONFLICTS WITH TREES. |
| | LIGHTING LOCATIONS ARE SHOWN ON THE LANDSCAPE PLAN TO |
| | AVOID CONFLICTS WITH REQUIRED TREES, BUT SITE PLAN AND |
| | ENGINEERING PLANS SHOW THE LIGHT POLES IN LANDSCAPE |
| | ISLANDS IN CONFLICT WITH REQUIRED TREES. |
| | ADDITIONAL COMMENTS 3/3/20: |
| | 16. SHORE JUNIPER AND VIBURNUM SUSPENSUM ARE NOT |
| | FLORIDA NATIVE PLANTS. THEY ARE NATIVE TO JAPAN. |
| | |
| | 17. PHASE 1 PLAN DOES NOT MEET THE REQUIREMENT FOR 75% |
| | OF THE REQUIRED PARKING LOT TREES TO BE CATEGORY 1 |
| | TREES SUCH AS LIVE OAK TO PROVIDE SHADE FOR THE PARKING |
| | SPACES PER SECTION 94-443 (C)(3). |
| | |
| | 18. PHASE 2 PLAN IS MISSING REQUIRED TREES IN TERMINAL |
| | LANDSCAPE ISLANDS, AND DOES NOT MEET THE REQUIREMENT |
| | FOR 75% OF THE REQUIRED PARKING LOT TREES TO BE |
| | CATEGORY 1 TREES SUCH AS LIVE OAK TO PROVIDE SHADE FOR |
| | THE PARKING SPACES. |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| |