| Date |
Text |
| 2019-09-09 15:12:31 | TRAFFIC STUDY COMMENTS: |
| | 1. PROVIDE COUNTY TPS LETTER. |
| | 2. PROVIDE A TRAFFIC STUDY. |
| | 3. PROVIDE COORDINATE WITH ENGINEERING ON THE TRAFFIC |
| | STUDY REQUIREMENTS. |
| | 4. IDENTIFY THE POTENTIAL TRAFFIC IMPACT TO THE |
| | NEIGHBORHOOD STREET. |
| | 5. PLEASE CONSIDER CONNECTING 33RD STREET TO BROADWAY |
| | TO MINIMIZE TRAFFIC IMPACT TO THE NEIGHBORHOOD. |
| | |
| | |
| | SITE PLAN COMMENTS: |
| | 6. INCLUDE REQUIRED BICYCLE PARKING SPACES IN THE SITE |
| | DATA TABLE AND INDICATE LOCATIONS OF THE REQUIRED |
| | BICYCLE PARKING SPACES. |
| | 7. PROVIDE AT LEAST 20 FEET OF QUEUING SPACE FOR THE |
| | ENTRY GATE. QUEUED VEHICLES SHALL NOT OBSTRUCT ANY |
| | VEHICULAR, PEDESTRIAN OR BICYCLE PATHS PER CITY CODE |
| | SECTION 78-1. |
| | 8. THE CITY DOES NOT SUPPORT ACCESS TO THE PARKING LOT |
| | FROM THE ALLEY. |
| | 9. IT IS THE CITY'S POLICY TO PROVIDE INTERCONNECTED |
| | SYSTEM OF STREETS. PLEASE CONSIDER PROVIDING 15-FOOT |
| | WIDE PAVEMENT IN THE ALLEY. |
| | 10. PLEASE COORDINATE WITH ENGINEERING ON THE PLANNED |
| | LANE ELIMINATION ON BROADWAY. |
| | 11. PLEASE COORDINATE WITH PALMTRAN ON THE EXISTING BUS |
| | STOP ON BROADWAY AND PROVIDE A BUS SHELTER. |
| | 12. SHOW THE REQUIRED 20-FOOT VISIBILITY TRIANGLE. |
| | 13. REPAVE 33RD STREET AND THE ALLEY ALONG THE SITE |
| | FRONTAGE AFTER DRAINAGE AND WATER AND SEWAGE SERVICE |
| | TIE IN. |
| | |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| |
Print |