Plan Review Notes
Plan Review Notes For Project Z19080025
Project Number Z19080025
Review Stop SURVEY
Sequence Number 1
Notes
Date Text
2019-09-10 09:01:091. ADD CONVERSION TO NGVD-29 ON ALL PLANS.
 2. WHY ARE INVERT ELEVATIONS CROSSED OUT ON SURVEY?
 3. LEICA GPS IS NOT AN ORIGINATING BENCHMARK. SHOULD BE
 LABELED AS BOUNDARY & TOPOGRAPHIC SURVEY.
 4. DUMPSTER DOORS CANNOT OPEN INTO ALLEY.
 5. PHASE 1 PARKING LANES DURING CONSTRUCTION APPEAR TO
 BE AN UNSAFE DRIVEWAY CONDITION.
 6. ALL DETAILS NEED TO BE PER CITY OF WEST PALM BEACH.
 7. RECOMMEND APPLICANT MEET WITH TRAFFIC AND
 ENGINEERING.
 8. PLEASE REFER TO ENGINEERING CHECKLIST IN THE
 DEVELOPMENT APPLICATION FOR REQUIRED INFORMATION PRIOR
 TO RE-SUBMITTAL.
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved