| Date |
Text |
| 2019-09-11 11:15:36 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | 1. SUGGEST ADJUSTING THE PHASING LINE SO THAT DRAINAGE |
| | PROPOSED TO BE CONSTRUCTED IN PHASE 1 WILL BE INCLUDED |
| | IN THE PHASE 1 AREA. |
| | |
| | 2. THE CITY'S VERTICAL DATUM IS NGVD 1929. THE CITY HAS |
| | ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION |
| | EQUATION TO NGVD 1929 IS PROVIDED ON THE SHEET(S). LIST |
| | THE VERTICAL DATUM AND CONVERSION EQUATION ON ALL |
| | SHEETS THAT CONTAIN ELEVATION INFORMATION. ADD |
| | CONVERSION EQUATION TO THE SURVEY. |
| | |
| | 3. IS A TURNAROUND SPACE NEEDED IN THE NORTH PARKING |
| | LOT? |
| | |
| | 4. CAP SERVICE LINES BACK TO THE MAIN. |
| | |
| | 5. CREATE A SWALE ALONG THE SOUTH PROPERTY LINE. |
| | |
| | 6. PROVIDE CCTV OF THE 33RD STREET 72" STORM PIPE |
| | BETWEEN EXISTING DRAINAGE STRUCTURES. |
| | |
| | 7. ENGINEERING PLANS ARE MISSING THE CERTIFICATE OF |
| | AUTHORIZATION FOR THE ENGINEERING FIRM. |
| | |
| | 8. ONSITE DRAINAGE SYSTEM TO BE DESIGNED PER SFWMD |
| | CRITERIA FOR STORMWATER QUALITY TREATMENT AND PEAK FLOW |
| | ATTENUATION. |
| | |
| | 9. ADD THE WEIR ELEVATION TO CS #105 ON THE PGD PLAN. |
| | |
| | 10. INDICATE ON THE PGD PLAN WHICH DRAINAGE STRUCTURES |
| | WILL HAVE PRBS AND ON WHICH SIDE(S) OF THE STRUCTURES. |
| | |
| | 11. BROADWAY AVE IS MAINTAINED BY FDOT. ANY WORK WITHIN |
| | THE BROADWAY AVE. RIGHT OF WAY WILL REQUIRE A PERMIT |
| | FROM FDOT. |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |