2019-09-11 11:15:36THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. SUGGEST ADJUSTING THE PHASING LINE SO THAT DRAINAGE
 PROPOSED TO BE CONSTRUCTED IN PHASE 1 WILL BE INCLUDED
 IN THE PHASE 1 AREA.
  
 2. THE CITY'S VERTICAL DATUM IS NGVD 1929. THE CITY HAS
 ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION
 EQUATION TO NGVD 1929 IS PROVIDED ON THE SHEET(S). LIST
 THE VERTICAL DATUM AND CONVERSION EQUATION ON ALL
 SHEETS THAT CONTAIN ELEVATION INFORMATION. ADD
 CONVERSION EQUATION TO THE SURVEY.
  
 3. IS A TURNAROUND SPACE NEEDED IN THE NORTH PARKING
 LOT?
  
 4. CAP SERVICE LINES BACK TO THE MAIN.
  
 5. CREATE A SWALE ALONG THE SOUTH PROPERTY LINE.
  
 6. PROVIDE CCTV OF THE 33RD STREET 72" STORM PIPE
 BETWEEN EXISTING DRAINAGE STRUCTURES.
  
 7. ENGINEERING PLANS ARE MISSING THE CERTIFICATE OF
 AUTHORIZATION FOR THE ENGINEERING FIRM.
  
 8. ONSITE DRAINAGE SYSTEM TO BE DESIGNED PER SFWMD
 CRITERIA FOR STORMWATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION.
  
 9. ADD THE WEIR ELEVATION TO CS #105 ON THE PGD PLAN.
  
 10. INDICATE ON THE PGD PLAN WHICH DRAINAGE STRUCTURES
 WILL HAVE PRBS AND ON WHICH SIDE(S) OF THE STRUCTURES.
  
 11. BROADWAY AVE IS MAINTAINED BY FDOT. ANY WORK WITHIN
 THE BROADWAY AVE. RIGHT OF WAY WILL REQUIRE A PERMIT
 FROM FDOT.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved