Plan Review Notes For Project Z19080025
Project Number Z19080025
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2019-09-06 10:16:331. PLEASE SUBMIT A FORMAL AS-BUILT REQUEST FOR ALL CITY
 OF WEST PALM BEACH-OWNED UTILITIES WITHIN THE PUBLIC
 RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE LIMITS OF
 YOUR PROJECT. IDENTIFY TYPE OF UTILITY, LOCATION, PIPE
 MATERIAL, AGE AND SIZE. PLEASE CONTACT JANICE TARBILL
 IN THE WPB ENGINEERING SERVICES DEPARTMENT AT
 [email protected] OR 561-494-1079 FOR FURTHER
 ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR INFORMATION
 ONLY. FIELD VERIFY UTILITY LOCATIONS USING FIELD
 SURVEY, POT-HOLING, SOFT DIGS ETC.
 2. AS OF DECEMBER 20, 2015, THE CITY OF WEST PALM BEACH
 CROSS-CONNECTION CONTROL MANUAL HAS BEEN REVISED,
 STATING "ALL BACKFLOW DEVICES MUST BE LEAD-FREE". FOR
 MORE INFORMATION, REFER TO THE LINK BELOW:
 HTTP://WPB.ORG/DEPARTMENTS/PUBLIC-UTILITIES/FORMS-PUBLI
 CATIONS/BACKFLOW-CROSS-CONNECTION-CONTROL-MANUAL
 3. PLANS SHALL SHOW PROPOSED LOCATIONS AND DIMENSIONS
 OF ALL WATER, STORM WATER, AND SANITARY AND SEWER
 LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR WATER
 AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL VALVES,
 METERS, AND OTHERS DEVICES TO BE INSTALLED ON THE
 SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING
 GRADES, PIPES SIZES, MATERIALS, ELEVATIONS,
 ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL
 INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER
 LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE
 PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN
 VIEW ON PLAN VIEW FOR ALL SANITARY AND STORM SEWERS.
 ADDITIONALLY, PLAN VIEW SHALL SHOW ALL EXISTING AND
 PROPOSED UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER
 OPTIC, ELECTRIC, GAS, AND CABLEVISION &
 TELECOMMUNICATION FACILITIES LOCATED ON THE
 RIGHT-OF-WAY. PROVIDE PROFILE AND CLEARANCES AT ALL
 UTILITY CROSSINGS. CUT AND CAP UTILITIES NOT IN USE,
 AND REMOVE ANY ABANDONED UTILITY LINES LARGER THAN 2
 INCHES FROM CITY RIGHT OF WAY.
 4. PLEASE SUBMIT COMPLETED LOS ANALYSIS SUMMARY TABLE
 DIRECTLY TO ENGINEERING (SHEET 33 OF CITY OF WPB
 DEVELOPMENT APPLICATION).
 5. SHOW DIMENSIONS OF PROPOSED DUMPSTER PER CURRENT
 CITY OF WPB STANDARD DETAIL GC-8.
 6. CHECK TO SEE IF FDEP FORMS FOR PROPOSED SANITARY
 SEWER ARE REQUIRED.
 7. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA
 AND FIRE BACKFLOW PREVENTER AS DCDA.
 8. PROVIDE VIDEO OF EXISTING SANITARY SEWER ALONG
 ENTIRE PROJECT FRONTAGE.
 9. PROVIDE CALCULATIONS OF EXISTING AND PROPOSED
 DEMANDS FOR WATER & SEWER (AVERAGE, MAXIMUM & PEAK) AND
 FIRE FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6
 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 10. PROVIDE VERTICAL DATUM AND DATUM CONVERSION
 INFORMATION (NAVD 1988 AND NGVD 1929).
 11. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 EASEMENT FOR PLACEMENT OF PROPOSED WATER METERS.
 12. FOR FORMAL ENGINEERING SUBMITTAL, PLEASE PROVIDE
 ENLARGED VIEW ON PLANS OF PROPOSED LOCATION OF WATER
 METER AND BACKFLOW PREVENTION.
 13. FOR FORMAL ENGINEERING SUBMITTAL, PROVIDE PROFILES
 OF WATER AND SEWER AND SHOW ANY CROSSINGS/CONFLICTS.
 14. FOR FORMAL ENGINEERING SUBMITTAL, WHEN SUBMITTING
 APPROVED MATERIALS LIST, PLEASE PROVIDE MATERIAL/CUT
 SHEETS FOR ALL PROPOSED BACKFLOW DEVICES SHOWING
 SPECIFIC MODEL NUMBER AND SPECIFYING USC APPROVED
 LEAD-FREE DESIGN.
 15. FOR FORMAL ENGINEERING SUBMITTAL CLEARLY SHOW ROAD
 RIGHT OF WAY.
 16. FOR FORMAL ENGINEERING SUBMITTAL, ON SHEET PP1
 PROVIDE INLET PROTECTION AT CATCH BASIN ON NW CORNER.
 17. ADD CITY OF WEST PALM BEACH STANDARD DETAIL PC-2
 AND PC-3 TO SHEET PP2.
 18. UPDATE ALL REFERENCES TO CITY OF WPB STANDARD
 DETAILS TO MOST CURRENT VERSIONS WHICH CAN BE FOUND
 HERE: HTTPS://WWW.WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLI
 C-WORKS/ENGINEERING-STANDARDS-DETAILS
 19. PROVIDE ALL RELEVANT CURRENT CITY OF WPB STANDARD
 DETAILS ? PAVEMENT RESTORATION, PAVING, DUMPSTER
 ENCLOSURE, WATER, SEWER ETC.
 20. PLEASE SHOW PROPOSED AND EXISTING FIRE HYDRANTS.
 21. PLEASE REMOVE PROPOSED WATER CONNECTION IN ALLEY; 4
 IN. LINE IS NOT ADEQUATE FOR SERVICE.
 22. PLEASE REALIGN PROPOSED WATER SERVICE CONNECTION
 FROM BROADWAY IN A NORTH/SOUTH ORIENTATION (NOT
 DIAGONALLY). ADJUST METER AND BACKFLOW PLACEMENT
 ACCORDINGLY.
 23. PLEASE RESPOND TO ALL COMMENTS IN WRITING.
  
  