| 2019-09-11 12:16:05 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT |
| | APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | 1. WHERE DOES THE EXISTING CURB INLET ON THE EASTERN |
| | PART OF BANYAN BLVD ON SHEET 1 OF 2 DRAIN TO? |
| | |
| | 2. WHERE DOES THE EXISTING CATCH BASIN ON N. OLIVE AVE. |
| | TO THE NORTHEAST OF THE NEW CWPB SANITARY MANHOLE DRAIN |
| | TO? |
| | |
| | 3. SHOW LIMITS OF MILLING AND RESURFACING ON THE |
| | STREETS. |
| | |
| | 4. PROVIDE CCTV OF THE EXISTING STORM PIPE ON BANYAN |
| | BLVD. AND OF THE STORM SYSTEM ALONG THE EAST SIDE OF N. |
| | DIXIE HWY. |
| | |
| | 5. PROVIDE CROSS SECTIONS FOR N. DIXIE HWY AND BANYAN |
| | BLVD. FROM FACE OF BUILDING TO ROAD CENTERLINE. |
| | |
| | 6. PROVIDE CROSS SECTION FROM EAST SIDE OF BUILDING TO |
| | THE FIRST BANK DRIVE THROUGH LANE ON THE EAST SIDE OF |
| | THE PROPOSED 1.5' CONCRETE DIVIDER ISLAND. |
| | |
| | 7. PROPOSED 18" YELLOW STRIPING MAY NOT BE APPROPRIATE |
| | ON THE RIGHT SIDE OF TRAVEL LANES (DRIVEWAY |
| | ENTRANCE/EXIT). |
| | |
| | 8. PROVIDE PROFILE OF STORM PIPE BETWEEN STORMCEPTOR |
| | AND STORM MANHOLE IN BANYAN BLVD. SHOWING ALL OF THE |
| | UTILITIES CROSSING THE PROPOSED STORM PIPE. |
| | |
| | 9. INDICATE HOW THE PROPOSED PUBLIC OPEN SPACE WILL |
| | DRAIN. |
| | |
| | 10. ADD THE NAVD88 TO NGVD29 CONVERSION TO THE SURVEY. |
| | |
| | 11. THE SURVEY SHOWS EXISTING CATCH BASINS THAT ARE NOT |
| | CALLED OUT ON THE CONCEPTUAL PAVING AND DRAINAGE PLAN |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |