Plan Review Notes
Plan Review Notes For Project Z19080020
Project Number Z19080020
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-09-11 12:16:05THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
 1. WHERE DOES THE EXISTING CURB INLET ON THE EASTERN
 PART OF BANYAN BLVD ON SHEET 1 OF 2 DRAIN TO?
  
 2. WHERE DOES THE EXISTING CATCH BASIN ON N. OLIVE AVE.
 TO THE NORTHEAST OF THE NEW CWPB SANITARY MANHOLE DRAIN
 TO?
  
 3. SHOW LIMITS OF MILLING AND RESURFACING ON THE
 STREETS.
  
 4. PROVIDE CCTV OF THE EXISTING STORM PIPE ON BANYAN
 BLVD. AND OF THE STORM SYSTEM ALONG THE EAST SIDE OF N.
 DIXIE HWY.
  
 5. PROVIDE CROSS SECTIONS FOR N. DIXIE HWY AND BANYAN
 BLVD. FROM FACE OF BUILDING TO ROAD CENTERLINE.
  
 6. PROVIDE CROSS SECTION FROM EAST SIDE OF BUILDING TO
 THE FIRST BANK DRIVE THROUGH LANE ON THE EAST SIDE OF
 THE PROPOSED 1.5' CONCRETE DIVIDER ISLAND.
  
 7. PROPOSED 18" YELLOW STRIPING MAY NOT BE APPROPRIATE
 ON THE RIGHT SIDE OF TRAVEL LANES (DRIVEWAY
 ENTRANCE/EXIT).
  
 8. PROVIDE PROFILE OF STORM PIPE BETWEEN STORMCEPTOR
 AND STORM MANHOLE IN BANYAN BLVD. SHOWING ALL OF THE
 UTILITIES CROSSING THE PROPOSED STORM PIPE.
  
 9. INDICATE HOW THE PROPOSED PUBLIC OPEN SPACE WILL
 DRAIN.
  
 10. ADD THE NAVD88 TO NGVD29 CONVERSION TO THE SURVEY.
  
 11. THE SURVEY SHOWS EXISTING CATCH BASINS THAT ARE NOT
 CALLED OUT ON THE CONCEPTUAL PAVING AND DRAINAGE PLAN
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120