| Date |
Text |
| 2019-10-07 12:48:06 | PASSED WITH THE FOLLOWING PROVISOS; FOR ENGINEERING |
| | SUBMITTAL - |
| | 1. PLEASE CORRECT THE NOTE SHOWING PROPOSED 76 L.F. OF |
| | 2 IN. WATER SERVICE (LEADER POINTS TO SANITARY LINE), |
| | AND SPECIFY MATERIAL. |
| | 2. PROVIDE CLEARANCES AT ALL UTILITY CONFLICTS. |
| | 3. SPECIFY MATERIAL FOR PROPOSED SANITARY LINE. |
| | 4. LABEL SIDEWALK. |
| | 5. PLEASE PROVIDE DETAIL OF STAIRS LEADING TO SIDEWALK |
| | IN RIGHT OF WAY AND SHOW ADA COMPLIANCE. |
| | 6. COORDINATE WITH MARK HURLEY, FIELD CUSTOMER SERVICE |
| | SUPERVISOR WITH CITY OF WPB PUBLIC UTILITIES, REGARDING |
| | PLACEMENT OF BACKFLOW DEVICES AND WATER METERS. CONTACT |
| | HIM AT 561-494-2262 OR [email protected] |
| | 7. PROVIDE UTILITY EASEMENTS TO ALLOW ACCESS FOR CITY |
| | PERSONNEL TO PROPOSED UTILITIES INCLUDING WATER METERS. |
| | 8. PLEASE PROVIDE ENLARGED VIEW ON PLANS OF PROPOSED |
| | LOCATION OF WATER METER AND BACKFLOW PREVENTION. |
| | 9. PLEASE CALLOUT DOMESTIC BACKFLOW PREVENTER AS RPPA |
| | AND FIRE BACKFLOW PREVENTER AS DCDA. SPECIFY LEAD FREE |
| | DESIGN ON ALL BACKFLOWS. |
| | 10. WHEN SUBMITTING APPROVED MATERIALS LIST, PLEASE |
| | PROVIDE MATERIAL/CUT SHEETS FOR ALL PROPOSED BACKFLOW |
| | DEVICES SHOWING SPECIFIC MODEL NUMBER AND SPECIFYING |
| | USC APPROVED LEAD-FREE DESIGN. |
| | 11. CLEARLY LABEL ROAD RIGHT OF WAY. |
| | 12. IF TRENCHING IN IN CITY MAINTAINED ROADWAY AREAS |
| | ADD NOTE TO PROVIDE 50 FT. PAVEMENT RESTORATION |
| | TRANSITION ON EACH SIDE OF PROPOSED TRENCH PER CITY OF |
| | WPB STANDARD DETAIL GC-9. |
| | 13. A MARKUP OF SHEET C-501 SHOWING SUGGESTED LAYOUT OF |
| | WATER CONNECTION HAS BEEN EMAILED TO THE EOR FOR HIS |
| | USE. |
| | 14. PLEASE RESPOND TO ALL COMMENTS IN WRITING AND |
| | INCLUDE Z PERMIT NUMBER. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO, PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX |
| | 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 |
| | FAX: (561) 494-1116 MOBILE: (561) 246-9525 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | MANNY GONZALEZ, SENIOR ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX |
| | 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] |
| | WWW.WPB.ORG/ENGINEERING |
| | |
| | |
| |
Print |