| Date |
Text |
| 2019-09-09 15:14:22 | TRAFFIC STUDY COMMENTS: |
| | 1. PROVIDE COUNTY TPS LETTER. |
| | 2. PROVIDE A TRAFFIC STUDY. |
| | 3. PROVIDE COORDINATE WITH ENGINEERING ON THE TRAFFIC |
| | STUDY REQUIREMENTS. |
| | |
| | |
| | SITE PLAN COMMENTS: |
| | 4. PLEASE IDENTIFY INNOVATIVE DESIGN ELEMENTS |
| | ASSOCIATED WITH THIS CPD MAJOR AMENDMENT. |
| | 5. PALM BEACH TPA CONDUCTED A TRANSIT ACCESS PLAN STUDY |
| | TO EVALUATE PEDESTRIAN AND BICYCLE SAFETY AND |
| | CONNECTIVITY ALONG PALM BEACH LAKES BOULEVARD. PLEASE |
| | COORDINATE WITH ENGINEERING TO IMPLEMENT THE RELEVANT |
| | ELEMENTS SUCH AS TWO-WAY CYCLE TRACK AND PEDESTRIAN |
| | SCALE LIGHTING ON PALM BEACH LAKES BOULEVARD BETWEEN |
| | EXECUTIVE CENTER DRIVE AND CONGRESS AVENUE IDENTIFIED |
| | IN THIS PLAN. |
| | 6. INCLUDE REQUIRED BICYCLE PARKING SPACES IN THE SITE |
| | DATA TABLE AND INDICATE LOCATIONS OF THE REQUIRED |
| | BICYCLE PARKING SPACES. |
| | 7. CONSIDER PROVIDING MICROMOBILITY FACILITY OR SCOOTER |
| | PARKING RACK ON SITE. |
| | 8. CONSIDER PROVIDING A PEDESTRIAN ENTRANCE DIRECTLY |
| | OFF PALM BEACH LAKES BOULEVARD TO EACH OF THE TWO USES. |
| | 9. PROVIDE AUTOTURN PATHS TO ILLUSTRATE 3-POINT |
| | TURNAROUND OF PASSENGER CARS AT THE 4 DEAD-END PARKING |
| | SPACES AT THE NORTHEAST CORNER OF THE SITE. |
| | 10. PROVIDE AUTOTURN PATH FOR DELIVERY TRUCK. |
| | 11. ON SHEET C-303, MOVE THE STOP BAR TOWARDS THE EAST. |
| | VEHICLES STOPPING AT THE STOP BAR SHOULD NOT BLOCK THE |
| | CROSSWALK. |
| | |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| |
Print |