| 2019-11-01 10:46:47 | PASSED, WITH THE FOLLOWING CONDITIONS. |
| | CONDITIONS OF APPROVAL: |
| | 1. THE PROPERTY OWNER AND PROJECT ENGINEER SHALL ASSESS |
| | THE CONDITION OF THE ALLEY ADJACENT TO THE FOUR (4) |
| | PARKING AREAS AND SUBMIT A PROPOSED RESTORATION SCOPE |
| | FOR THOSE AREAS AT TIME OF ENGINEERING PERMIT REVIEW. |
| | AT THE TIME OF PERMIT REVIEW, THE PROPERTY OWNER SHALL |
| | SUBMIT A PAVEMENT CORE REPORT ALONG THE ALLEY PREPARED |
| | BY A PROFESSIONAL ENGINEER, AND COMMIT TO RESTORE |
| | PORTIONS OF ALLEY PAVEMENT SECTIONS ABUTTING THE |
| | PROJECT PARKING AREAS. THE PROPERTY OWNER SHALL CONDUCT |
| | A DETAILED REVIEW OF THE DRAINAGE CONDITION ALONG THE |
| | ALLEY AND COMMIT TO PROVIDE POSITIVE DRAINAGE |
| | IMPROVEMENT TO PREVENT DRAINAGE ACCUMULATION ON THE |
| | PAVEMENT ALONG THE ALLEY SECTIONS ABUTTING THE PROJECT |
| | PARKING AREAS AT THE PROPERTY OWNER'S COST. |
| | 2. PROVIDE PAVEMENT MARKING AND SIGNAGE ALONG AND AT |
| | THE END OF THE ALLEY. STOP SIGNS AND STOP BARS SHOULD |
| | BE PROVIDED AT THE EGRESS POINT; MARKED CROSSWALKS |
| | SHOULD BE PROVIDED CROSSING THE ALLEY AT SPENCER DRIVE |
| | AND CONGRESS AVENUE; DOUBLE YELLOW SHOULD BE PROVIDED |
| | ALONG THE ALLEY WITH TWO 10-FOOT LANE; AND NO PARKING |
| | SIGNS SHOULD BE POSTED ALONG THE ALLEY AT REGULAR |
| | INTERVALS. |
| | 3. PRIOR TO EACH OCCURRENCE OF POLE DELIVERY TRUCKS |
| | ACCESSING THE SITE THROUGH THE SIDEWALK, PROPER PERMITS |
| | SHOULD BE OBTAINED AND ALL PUBLIC PROPERTIES, SUCH AS |
| | CURB, SIDEWALK, LANDSCAPE AND SIGNS, SHOULD BE |
| | PROTECTED. ANY DAMAGE TO THE PUBLIC PROPERTIES CAUSED |
| | BY POLE DELIVERY TRUCKS SHALL BE REPAIRED AND REPLACED |
| | BY FPL. |
| | |
| | LINA M. CAMACHO |
| | SENIOR PROJECT ENGINEER |
| | 561-494-1129 |
| | [email protected] |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| | |
| |