Plan Review Notes
Plan Review Notes For Project Z19070022
Project Number Z19070022
Review Stop STORM
Sequence Number 3
Notes
Date Text
2019-10-30 10:21:37THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 OCTOBER 28, 2019 SUBMITTAL REVIEW PACKAGE:
  
 1. WEIR ELEVATIONS ARE HIGHER THAN PAVEMENT GRADE
 ELEVATIONS. APPLICANT RESPONDED THAT THE EXFILTRATION
 TRENCH IS DESIGN TO STORE THE RUNOFF FROM THE 10-YEAR
 1-DAY DESIGN STORM EVENT WITHOUT THE PARKING LOT
 FLOODING. THE OVERFLOW WEIR ELEVATION FOR EACH PARKING
 LOT WAS SET TO CONTAIN ONSITE THE RUNOFF FROM THE
 10-YEAR 3-DAY DESIGN STORM.
  
 OVER TIME THE EFFECTIVENESS OF THE EXFILTRATION SYSTEMS
 TO DISPOSE OF THE STORMWATER RUNOFF WILL DIMINISH TO
 THE EXTENT THAT THE PARKING LOT WILL LIKELY FLOOD FOR
 STORM EVENTS SMALLER THAN THE 10-YEAR 1-DAY DESIGN
 STORM. THE APPLICANT SHOULD BE AWARE THAT THERE IS A
 RISK OF THERE BEING 12 TO 17 INCHES OF STANDING WATER
 IN THE PARKING LOTS DURING AND AFTER A STORM EVENT AND,
 DEPENDING ON THE GROUNDWATER TABLE AND EFFECTIVENESS OF
 THE EXFILTRATION TRENCHES, THE PARKING LOT(S) MAY BE
 FLOODED FOR AN EXTENDED PERIOD OF TIME.
  
 IT IS RECOMMENDED THAT THIS FLOOD RISK NOTICE BE
 INCLUDED IN ANY USE LEASE AGREEMENTS WITH THIRD
 PARTIES.
  
 2. DRAINAGE SYSTEMS TO BE DESIGNED TO MEET SFWMD
 CRITERIA FOR STORMWATER QUALITY AND PEAK DISCHARGE FOR
 PRE- VS POST-DEVELOPMENT CONDITIONS. THERE IS A
 MODIFIED EXFILTRATION TRENCH EQUATION WHEN (DS > DU) OR
 (W > 2* [DU + DS])
  
 3. ALL DRAINAGE STRUCTURES CONNECTED TO EXFILTRATION
 TRENCHES SHALL HAVE POLLUTANT RETARDANT BAFFLES OVER
 THE EXFILTRATION PIPE CONNECTION (WHETHER "UPSTREAM" OR
 "DOWNSTREAM" OF THE EXFILTRATION TRENCH).
  
 4. VERIFY DRAINAGE STRUCTURES ARE LARGE ENOUGH FOR THE
 INSTALLATION OF MORE THAN ONE PRB OR PRB AND WEIR IN
 THE STRUCTURES.
  
 5. PROVIDE CCTV VIDEO OF EXISTING DRAINAGE PIPES FROM
 THE ALLEY TO THE CANAL.
  
 6. SHOW AND LABEL THE PERIMETER BERM AND PROVIDE A
 DETAIL/CROSS SECTION OF THE BERM.
  
 7. CONFIRM IF STRUCTURE D-200 WILL CONNECT TO ONE OR
 TWO EXISTING NORTH-SOUTH DRAINAGE PIPES RUNNING ACROSS
 THE PROPERTY. TWO STORM LINES ARE SHOWN ON SHEET P-3.
  
 8. SHOW ON THE ENGINEERING PLANS AND LANDSCAPE PLANS
 THE PROPOSED EASEMENTS OVER THE EXISTING DRAINAGE PIPES
 CROSSING THE PARKING LOTS AND OVER THE SANITARY SEWER
 MAIN ALONG THE SOUTH PROPERTY LINE. THE DRAINAGE
 EASEMENTS WILL BE 10-FEET WIDE CENTERED ON THE PIPES.
 IF MULTIPLE PIPES (SEE COMMENT NO. 7 ABOVE) THEN THE
 EASEMENT WILL BE 15 FEET WIDE CENTERED BETWEEN THE
 PIPES. THE UTILITY EASEMENT FOR THE SANITARY SEWER MAIN
 WILL BE 5 FEET WIDE ALONG THE SOUTH PROPERTY LINE WHERE
 THE MAIN IS LOCATED.
  
 9. ADDITIONAL ROOT BARRIERS WILL BE NEEDED (LANDSCAPE
 PLANS) BETWEEN PROPOSED TREES AND THE EXISTING DRAINAGE
 PIPES.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  