Plan Review Notes
Plan Review Notes For Project Z19070022
Project Number Z19070022
Review Stop TRAFFIC
Sequence Number 2
Notes
Date Text
2019-09-18 12:05:38SITE PLAN COMMENTS:
 1. BASED ON THE EXHIBITS PROVIDED, IT APPEARS THAT TWO
 OUT OF THE FIVE EXISTING FPL PARKING LOTS ARE LEASED BY
 3RD PARTY COMPANIES NOT LOCATED ALONG THIS OKEECHOBEE
 TRANSMISSION CORRIDOR. PLEASE JUSTIFY THE ASSUMPTION
 THAT THE PARKING LOTS WOULD BE PREDOMINATELY LEASED BY
 BUSINESSES ABUTTING THE ALLEY.
 2. PLEASE CLARIFY IF THE ESTIMATION OF 15 TRIPS PER DAY
 IS REASONABLE. SINCE EACH VEHICLE SHUFFLE OR EMPLOYEE
 OVERFLOW PARKING WOULD CREATE 2 TRIPS PER DAY, THERE
 WOULD BE A MAXIMUM OF 7.5 VEHICLE SHUFFLES OR EMPLOYEE
 OVERFLOW PARKING PER DAY. ALSO, IT IS UNKNOWN HOW MANY
 LESSEES THERE MAY BE. IF THERE ARE 5 LESSEES, EACH
 LESSEE WOULD HAVE ONLY 1 TO 2 VEHICLE SHUFFLE OR
 EMPLOYEE OVER FLOW PARKING, WHICH APPEAR TO BE LOW
 GIVEN THE SIZE OF THE BUSINESSES.
  
 CONDITIONS OF APPROVAL:
 1. THE PROPERTY OWNER AND PROJECT ENGINEER SHALL ASSESS
 THE CONDITION OF THE ALLEY ADJACENT TO THE FOUR (4)
 PARKING AREAS AND SUBMIT THE PROPOSED RESTORATION SCOPE
 FOR THOSE AREAS AT TIME OF WPB ENGINEERING PERMIT
 REVIEW. AT THE TIME OF PERMIT REVIEW, THE PROPERTY
 OWNER SHALL SUBMIT A PAVEMENT CORE REPORT ALONG THE
 ALLEY PREPARED BY A PROFESSIONAL ENGINEER, AND COMMIT
 TO RESTORE THE PAVEMENT SECTION OF THE ALLEY. THE
 PROPERTY OWNER SHALL CONDUCT A DETAILED REVIEW OF THE
 DRAINAGE CONDITION ALONG THE ALLEY AND COMMIT TO
 PROVIDE POSITIVE DRAINAGE IMPROVEMENT TO PREVENT
 DRAINAGE ACCUMULATION ON THE PAVEMENT ALONG THE ALLEY
 AT THE PROPERTY OWNER'S COST.
 2. PROVIDE PAVEMENT MARKING AND SIGNAGE ALONG AND AT
 THE END OF THE ALLEY. STOP SIGNS AND STOP BARS SHOULD
 BE PROVIDED AT THE EGRESS POINT; MARKED CROSSWALKS
 SHOULD BE PROVIDED CROSSING THE ALLEY AT SPENCER DRIVE
 AND CONGRESS AVENUE; DOUBLE YELLOW SHOULD BE PROVIDED
 ALONG THE ALLEY WITH TWO 10-FOOT LANE; AND NO PARKING
 SIGNS SHOULD BE POSTED ALONG THE ALLEY AT REGULAR
 INTERVALS.
 3. PRIOR TO EACH OCCURRENCE OF POLE DELIVERY TRUCKS
 ACCESSING THE SITE THROUGH THE SIDEWALK, PROPER PERMITS
 SHOULD BE OBTAINED AND ALL PUBLIC PROPERTIES, SUCH AS
 CURB, SIDEWALK, LANDSCAPE AND SIGNS, SHOULD BE
 PROTECTED. ANY DAMAGE TO THE PUBLIC PROPERTIES CAUSED
 BY POLE DELIVERY TRUCKS SHALL BE REPAIRED AND REPLACED
 BY FPL.
  
  
 LINA M. CAMACHO
 SENIOR PROJECT ENGINEER
 561-494-1129
 [email protected]
  
 SHING TSOI
 CITY IN-HOUSE TRAFFIC CONSULTANT
 561-494-1141
 [email protected]
 (IN-HOUSE ON TUESDAYS AND WEDNESDAYS)
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved