| Date |
Text |
| 2019-09-18 12:05:38 | SITE PLAN COMMENTS: |
| | 1. BASED ON THE EXHIBITS PROVIDED, IT APPEARS THAT TWO |
| | OUT OF THE FIVE EXISTING FPL PARKING LOTS ARE LEASED BY |
| | 3RD PARTY COMPANIES NOT LOCATED ALONG THIS OKEECHOBEE |
| | TRANSMISSION CORRIDOR. PLEASE JUSTIFY THE ASSUMPTION |
| | THAT THE PARKING LOTS WOULD BE PREDOMINATELY LEASED BY |
| | BUSINESSES ABUTTING THE ALLEY. |
| | 2. PLEASE CLARIFY IF THE ESTIMATION OF 15 TRIPS PER DAY |
| | IS REASONABLE. SINCE EACH VEHICLE SHUFFLE OR EMPLOYEE |
| | OVERFLOW PARKING WOULD CREATE 2 TRIPS PER DAY, THERE |
| | WOULD BE A MAXIMUM OF 7.5 VEHICLE SHUFFLES OR EMPLOYEE |
| | OVERFLOW PARKING PER DAY. ALSO, IT IS UNKNOWN HOW MANY |
| | LESSEES THERE MAY BE. IF THERE ARE 5 LESSEES, EACH |
| | LESSEE WOULD HAVE ONLY 1 TO 2 VEHICLE SHUFFLE OR |
| | EMPLOYEE OVER FLOW PARKING, WHICH APPEAR TO BE LOW |
| | GIVEN THE SIZE OF THE BUSINESSES. |
| | |
| | CONDITIONS OF APPROVAL: |
| | 1. THE PROPERTY OWNER AND PROJECT ENGINEER SHALL ASSESS |
| | THE CONDITION OF THE ALLEY ADJACENT TO THE FOUR (4) |
| | PARKING AREAS AND SUBMIT THE PROPOSED RESTORATION SCOPE |
| | FOR THOSE AREAS AT TIME OF WPB ENGINEERING PERMIT |
| | REVIEW. AT THE TIME OF PERMIT REVIEW, THE PROPERTY |
| | OWNER SHALL SUBMIT A PAVEMENT CORE REPORT ALONG THE |
| | ALLEY PREPARED BY A PROFESSIONAL ENGINEER, AND COMMIT |
| | TO RESTORE THE PAVEMENT SECTION OF THE ALLEY. THE |
| | PROPERTY OWNER SHALL CONDUCT A DETAILED REVIEW OF THE |
| | DRAINAGE CONDITION ALONG THE ALLEY AND COMMIT TO |
| | PROVIDE POSITIVE DRAINAGE IMPROVEMENT TO PREVENT |
| | DRAINAGE ACCUMULATION ON THE PAVEMENT ALONG THE ALLEY |
| | AT THE PROPERTY OWNER'S COST. |
| | 2. PROVIDE PAVEMENT MARKING AND SIGNAGE ALONG AND AT |
| | THE END OF THE ALLEY. STOP SIGNS AND STOP BARS SHOULD |
| | BE PROVIDED AT THE EGRESS POINT; MARKED CROSSWALKS |
| | SHOULD BE PROVIDED CROSSING THE ALLEY AT SPENCER DRIVE |
| | AND CONGRESS AVENUE; DOUBLE YELLOW SHOULD BE PROVIDED |
| | ALONG THE ALLEY WITH TWO 10-FOOT LANE; AND NO PARKING |
| | SIGNS SHOULD BE POSTED ALONG THE ALLEY AT REGULAR |
| | INTERVALS. |
| | 3. PRIOR TO EACH OCCURRENCE OF POLE DELIVERY TRUCKS |
| | ACCESSING THE SITE THROUGH THE SIDEWALK, PROPER PERMITS |
| | SHOULD BE OBTAINED AND ALL PUBLIC PROPERTIES, SUCH AS |
| | CURB, SIDEWALK, LANDSCAPE AND SIGNS, SHOULD BE |
| | PROTECTED. ANY DAMAGE TO THE PUBLIC PROPERTIES CAUSED |
| | BY POLE DELIVERY TRUCKS SHALL BE REPAIRED AND REPLACED |
| | BY FPL. |
| | |
| | |
| | LINA M. CAMACHO |
| | SENIOR PROJECT ENGINEER |
| | 561-494-1129 |
| | [email protected] |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| | |
| |
Print |