| Plan Review Notes For Project Z19070022 |
| Project Number |
Z19070022 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-10-08 17:10:40 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | SEPTEMBER 5, 2019 REVIEW SET OF PLANS: | | | | | | 1. SHOW AND LABEL THE PERIMETER BERM AND PROVIDE A | | | DETAIL/CROSS SECTION OF THE BERM. | | | | | | 2. ALL DRAINAGE STRUCTURES CONNECTED TO EXFILTRATION | | | TRENCHES SHALL HAVE POLLUTANT RETARDANT BAFFLES OVER | | | THE EXFILTRATION PIPE (WHETHER "UPSTREAM" OR | | | "DOWNSTREAM" OF THE EXFILTRATION TRENCH. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |