| Date |
Text |
| 2019-08-14 10:28:48 | TRAFFIC STATEMENT COMMENTS: |
| | 1. PROVIDE COUNTY TPS LETTER. |
| | 2. CLARIFY HOW THE PARKING LOTS WOULD BE USED, |
| | INCLUDING THE EXPECTED USERS AND FREQUENCY OF TRAFFIC |
| | MOVEMENTS INTO/OUT OF THE PARKING LOTS. |
| | 3. DOCUMENT TRIP DISTRIBUTION ALONG AND CROSSING THE |
| | ALLEY, SPENCER DRIVE, CONGRESS AVENUE, AND OKEECHOBEE |
| | BOULEVARD, AS APPLICABLE. |
| | 4. CONDUCT INTERSECTION OPERATIONAL ANALYSIS AT THE |
| | ALLEY WITH SPENCER DRIVE AND CONGRESS AVENUE. |
| | ADDITIONAL INTERSECTION ANALYSES MAY BE REQUIRED |
| | DEPENDING ON THE INTENDED USERS OF THE PARKING LOT AND |
| | THE NUMBER OF TRIPS GENERATED ON PUBLIC STREETS. |
| | SITE PLAN COMMENTS: |
| | 5. PLEASE REBUILD FULL PAVEMENT SECTION OF THE ALLEY. |
| | 6. SHOW AUTOTURN FOR ALL POTENTIAL LARGE TRUCK |
| | MOVEMENTS IN THE PARKING LOTS. |
| | 7. PROVIDE PAVEMENT MARKING AND SIGNAGE ALONG AND AT |
| | THE END OF THE ALLEY. STOP SIGNS AND STOP BARS SHOULD |
| | BE PROVIDED AT THE EGRESS POINT; MARKED CROSSWALKS |
| | SHOULD BE PROVIDED CROSSING THE ALLEY AT SPENCER DRIVE |
| | AND CONGRESS AVENUE; DOUBLE YELLOW SHOULD BE PROVIDED |
| | ALONG THE ALLEY WITH TWO 10-FOOT LANE; AND NO PARKING |
| | SIGNS SHOULD BE POSTED ALONG THE ALLEY AT REGULAR |
| | INTERVALS. |
| | 8. CLARIFY THE DRAINAGE IMPACT TO THE ALLEY AFTER THE |
| | PARKING LOT IS BUILT. PROVIDE DRAINAGE CALCULATION TO |
| | COMPARE BEFORE AND AFTER CONDITIONS, AND IDENTIFY THE |
| | DRAINAGE FACILITIES NEEDED TO ACCOMMODATE THE RUNOFF IN |
| | THE ALLEY. |
| | |
| | |
| | LINA M. CAMACHO |
| | SENIOR PROJECT ENGINEER |
| | 561-494-1129 |
| | [email protected] |
| | |
| | |
| | SHING TSOI |
| | CITY IN-HOUSE TRAFFIC CONSULTANT |
| | 561-494-1141 |
| | [email protected] |
| | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| | |
| |
Print |