2020-03-18 10:30:45THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE MARCH
 17, 2020 REVIEW SUBMITTAL. THE COMMENTS MAY BE PROVISOS
 FOR CONDITIONAL SITE PLAN APPROVAL AND BE ADDRESSED
 DURING ENGINEERING PERMIT SUBMISSION.
  
 1. THE CURB LINE ALONG TRINITY PLACE AT S. OLIVE AVE
 MAY NEED TO BE ADJUSTED TO ALIGN WITH THE PROPOSED TOP
 FOR THE EXISTING DRAINAGE STRUCTURE.
  
 2. SHOW EXISTING AND PROPOSED PEDESTRIAN EASEMENTS ON
 THE PERIMETER SECTIONS ON SHEET C8.00.
  
 3. TRENCH DRAIN AT THE SOUTH DRIVEWAY MAY NOT BE
 NECESSARY SINCE IT IS LOCATED SO FAR INTO THE GARAGE.
 GRADE THE DRIVEWAY TO DRAIN TO THE CONTROL STRUCTURE.
  
 4. CONSIDER SLOPING THE STORMWATER PIPES BETWEEN THE
 CONTROL STRUCTURE AND EXISTING CATCH BASIN ON TRINITY
 PLACE.
  
 5. CONSIDER FLATTENING THE SLOPE OF THE PARKING AREA IN
 PERIMETER SECTION B-B TO 2% AND STEEPENING THE SLOPE OF
 THE LANDSCAPE AREA BEHIND THE CURB.
  
 6. SHOW SWALE TYPE CROSS SECTIONS IN THE LANDSCAPE
 AREAS TO CAPTURE AND RETAIN/DETAIN RUNOFF FROM THE
 SIDEWALK AREAS.
  
 7. GRATE ELEVATION (11.50? NAVD) OF THE NORTH TRENCH
 DRAIN APPEARS TO BE LOWER THAN THE ADJACENT DRIVEWAY
 GRADES.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved