Plan Review Notes
Plan Review Notes For Project Z19070006
Project Number Z19070006
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-08-14 00:05:50THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
  
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. MOVE THE DRAINAGE CONTROL STRUCTURE AND THE PIPE TO
 THE EAST OUT OF THE RIGHT-OF-WAY. AN ADDITIONAL
 DRAINAGE STRUCTURE MAY BE NEEDED NORTH OF THE PROPOSED
 CATCH BASIN INLET IN THE TRINITY PLACE R/W.
  
 2. SHOW UTILITIES ON THE LANDSCAPE PLANS.
  
 3. CONSIDER A STORMWATER MANAGEMENT SYSTEM DIFFERENT
 FROM EXFILTRATION TRENCHES. THE EFFECTIVE LIFE OF
 EXFILTRATION TRENCHES IS 5 ? 10 YEARS OR LESS BEFORE
 THEY WILL NEED TO BE REPLACED. DIGGING UP AND REPLACING
 THE TRENCHES WILL HAVE AN IMPACT ON THE INTERIOR
 TRAFFIC CIRCULATION.
  
 4. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD
 CRITERIA FOR STORMWATER TREATMENT AND PEAK FLOW
 ATTENUATION FOR PRE- VS POST-DEVELOPMENT DISCHARGE.
  
 5. THE DRAINAGE SYSTEM IN OLIVE AVE INCLUDES CONTROL
 STRUCTURES WHICH AFFECT THE HYDRAULIC GRADE LINE. THE
 HGL MAY BE HIGHER THAN THE WEIR ELEVATION IN THE
 PROPOSED CONTROL STRUCTURE.
  
 6. PROVIDE CCTV OF THE EXISTING DRAINAGE SYSTEMS
 SURROUNDING THE PROJECT SITE.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PERMIT PRIOR TO
 STARTING CONSTRUCTION.
  
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  