| Date |
Text |
| 2020-03-12 16:59:42 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | FEBRUARY 2020 DATED CIVIL PLANS: | | | | | | 1. THE CITY'S VERTICAL DATUM IS NGVD1929. THE | | | ENGINEERING PLANS ARE USING NAVD1988. LIST FHE VERTICAL | | | DATUM BASIS AND CONVERSION EQUATION TO NGVD1929 ON | | | EVERY SHEET WITH ELEVATION INFORMATION, INCLUDING THE | | | SURVEY. [REPEAT COMMENT] | | | | | | 2. ADJUST THE SILT FENCE TO INCLUDE THE NEW WATER MAIN | | | CONSTRUCTION. [REPEAT COMMENT] | | | | | | 3. STORMWATER WATER QUALITY TREATMENT AND PEAK FLOW | | | ATTENUATION TO BE PROVIDED FOR THE NEW CONSTRUCTION. | | | [REPEAT COMMENT] | | | | | | 4. CONFLICTING CALLOUTS FOR STOIRM PIPE MATERIAL FOR | | | CONSTRUCTING THE PIPE (RCP) AND CONNECTING TO CATCH | | | BASINS (PVC). | | | | | | 5. CLEANOUT CALLED OUT FOR ROOF DRAIN LATERAL | | | CONNECTION TO RCP PIPE. | | | | | | 6. ADD THE CITY'S PROJECT NUMBER TO THE COVER SHEET. | | | | | | 7. SHOW LIMITS OF CONCRETE REPLACEMENT ALONG EAST SIDE | | | OF TENNIS COURTS WHERE THE SANITARY SEWER IS BEING | | | INSTALLED. | | | | | | 8. IS SILT FENCE NEEDED ALONG THE EAST SIDE OF THE | | | TENNIS COURTS? | | | | | | 9. WHERE IS DRAINAGE STRUCTURE S-2? | | | | | | 10. REPLACE THE WATER MAIN BETWEEN THE PROPOSED 6" X 6" | | | X 2" TEE AND THE PROPOSED 45-DEGREE BEND. | | | | | | TRACY WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
| |
Print |
|