| 2019-06-10 18:46:32 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. THE EXISTING SURVEY AND CIVIL PLANS DO NOT LIST THE |
| | VERTICAL DATUM REFERENCE. THE CITY?S VERTICAL DATUM IS |
| | NGVD 1929. THE CITY HAS ALLOWED THE USE OF NAVD 1988 |
| | PROVIDED THE CONVERSION EQUATION TO NGVD 1929 IS |
| | PROVIDED ON THE SHEET(S). |
| | |
| | 2. IT APPEARS THE WATER MAIN REPLACEMENT WILL GO |
| | OUTSIDE THE FENCED CONSTRUCTION AREA. ADJUST THE SILT |
| | FENCE TO OUTSIDE THE CONSTRUCTION LIMITS. |
| | |
| | 3. THE EXISTING STORMWATER SYSTEM WILL NEED TO BE |
| | RELOCATED FROM UNDER THE PROPOSED RESTROOM BUILDING. |
| | |
| | 4. STORMWATER WATER QUALITY TREATMENT AND PEAK FLOW |
| | ATTENUATION TO BE PROVIDED FOR THE NEW CONSTRUCTION. |
| | |
| | 5. CAN HANDBALL COURT PAVEMENT BE REMOVED TO REDUCE THE |
| | AMOUNT OF IMPERVIOUSNESS? |
| | |
| | 6. CALLOUT/LABEL ROOT BARRIERS ON THE LANDSCAPE PLANS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |