| Plan Review Notes For Project Z19050024 |
| Project Number |
Z19050024 |
|
| Review Stop |
ENG - PPRC |
| Sequence Number |
5 |
|
| Notes |
| Date |
Text |
| 2020-09-23 16:42:52 | COMMENTS FROM MARK HURLEY, CITY OF WPB PUBLIC UTILITIES | | | CUSTOMER SERVICE, [email protected] OR 561-822-2262: | | | | | | RESPONSE TO PRIOR COMMENT DOES NOT MAKE SENSE: | | | | | | 2.) RECORDED BACKFLOW COVENANTS WILL BE REQUIRED FOR | | | ANY FIRELINE BACKFLOW ASSEMBLIES LOCATED INSIDE | | | BUILDINGS. MARK HURLEY CAN ASSIST WITH THAT PROCESS. | | | | | | RESPONSE: LIMITED IRRIGATION WATER WILL BE SOURCED FROM | | | THE PROPOSED POTABLE METER. FINAL METER SIZING WILL BE | | | COORDINATED AS PART OF THE CONSTRUCTION DRAWINGS / | | | PERMIT SUBMITTALS. | | | NEW COMMENTS: | | | | | | -PROPOSED FIRE HYDRANT MAY NOT BE LOCATED UNDER GUY | | | WIRES. THIS LOOKS TO BE THE CASE AT BARCELONA. IF SO, | | | PLEASE RELOCATE. | | | | | | -DURING ENGINEERING SUBMITTAL, VERIFY PROPOSED FIRE | | | HYDRANT AT CORDOVA HAS NO CLEARANCE ISSUES WITH STREET | | | SIGNS. IF CONFLICT EXISTS, LOCATION WILL NEED TO BE | | | ADJUSTED. | | | | | | |
| |
Print |
|