| 2019-10-09 15:43:19 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | OCTOBER 9, 2019 REVIEW SUBMITTAL PACKAGE: |
| | |
| | 1. IT APPEARS THE PROPOSED BUMPOUTS IN THE PARKING |
| | SPACES ON S. DIXIE HIGHWAY WILL BLOCK THE DRAINAGE FLOW |
| | IN THE GUTTER. |
| | |
| | 2. STAFF CANNOT DISCERN HOW THE STORMWATER RUNOFF IS |
| | BEING CONVEYED TO THE PROPOSED CASCADE SEPARATORS FOR |
| | WATER QUALITY TREATMENT.. |
| | |
| | 3. SHOW WHERE THE ROOF DOWNSPOUTS WILL BE LOCATED AND |
| | HOW THAT FLOW WILL BE CONNECTED TO THE ONSITE |
| | STORMWATER MANAGEMENT SYSTEM. |
| | |
| | 4. LABEL MINIMUM 6 FEET OF HORIZONTAL SEPARATION |
| | BETWEEN OUTSIDE WALLS OF WATER MAINS, STORMWATER MAINS |
| | AND SEWER MAINS. |
| | |
| | 5. SHOW MILL AND RESURFACE LIMITS FOR THE TRENCH CUTS |
| | ON S. DIXIE HWY. |
| | |
| | 6. PROVIDE CROSS SECTIONS FROM THE ROAD CENTERLINE TO |
| | FACE OF BUILDING OF EACH ON-STREET PARKING AREA TO SHOW |
| | PAVEMENT AND SIDEWALK WIDTHS/SLOPES. SHWO THE LOCATION |
| | OF THE RIGHT-OF-WAY LINE ON EACH CROSS SECTION. |
| | |
| | 7. REVISED SURVEY NOT INCLUDED IN THE REVIEW PACKAGE. |
| | |
| | 8. PROVIDE CORRESPONDENCE FROM FDOT THAT THEY HAVE NO |
| | OBJECTIONS TO THE STOMRWATER SYSTEM CONNECTING TO THE |
| | S. DIXIE HWY DRAINAGE SYSTEM. |
| | |
| | 9. CURB RAMPS WILL HAVE TO BE RECONSTRUCTED TO CURRENT |
| | ADA REQUIREMENTS (INCLUDED THE TRUNCATED DOMES) IF THE |
| | ASPHALT ADJACENT TO THE CURB RAMP IS |
| | DISTURBED/MODIFIED. THIS WILL APPLY TO THE NE CORNER OF |
| | FLAMINGO DRIVE AND SE CORNER OF CORDOVA ROAD. |
| | |
| | TRACY L. WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | [email protected] |
| | 561-494-1120 |
| |