| Date |
Text |
| 2019-10-11 09:26:14 | PASSED WITH PROVISOS: |
| | |
| | PLEASE INCLUDE CALCULATIONS ON ENGINEERING UTILITY |
| | PLANS OF EXISTING AND PROPOSED DEMANDS FOR WATER & |
| | SEWER (AVERAGE, MAXIMUM AND PEAK) AND FIRE FLOW |
| | DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6 FOR SEWER |
| | AND PER FAC 64-E.008 FOR WATER. |
| | |
| | PLEASE PROVIDE CCTV VIDEO OF EXISTING SANITARY SEWER |
| | ALONG ENTIRE PROJECT FRONTAGE. |
| | |
| | PLEASE CONFIRM THAT A SUBMITTAL FOR A FORMAL AS-BUILT |
| | REQUEST WAS MADE FOR ALL CITY OF WEST PALM BEACH-OWNED |
| | UTILITIES WITHIN THE PUBLIC RIGHT OF WAY FOR THE ENTIRE |
| | EXTENT OF THE LIMITS OF YOUR PROJECT. IDENTIFY TYPE OF |
| | UTILITY, LOCATION, PIPE MATERIAL, AGE AND SIZE. PLEASE |
| | CONTACT JANICE TARBILL IN THE WPB ENGINEERING SERVICES |
| | DEPARTMENT AT [email protected] OR 561-494-1079 FOR |
| | FURTHER ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR |
| | INFORMATION ONLY. FIELD VERIFY UTILITY LOCATIONS USING |
| | FIELD SURVEY, POT-HOLING, SOFT DIGS ETC. |
| | |
| | ENGINEERING PLANS SHALL SHOW PROPOSED LOCATIONS AND |
| | DIMENSIONS OF ALL WATER, STORMWATER, AND SANITARY AND |
| | SEWER LINES, INCLUDING STUBS TO EACH PROPERTY LINE FOR |
| | WATER AND SANITARY SEWERS, THE MAKE AND MODEL OF ALL |
| | VALVES, METERS, AND OTHERS DEVICES TO BE INSTALLED ON |
| | THE SYSTEM, CATCH BASINS, CULVERTS, DITCHES INCLUDING |
| | GRADES, PIPES SIZES, MATERIALS, ELEVATIONS, |
| | ASSUMPTIONS, CALCULATIONS, INVERT ELEVATIONS FOR ALL |
| | INLETS AND MANHOLES AND PROFILES OF SANITARY SEWER |
| | LINES. ALL AVAILABLE ELEVATION SHALL BE SHOWN ON THE |
| | PROFILE VIEW. DIRECTION OF FLOW SHALL BE SHOWN ON PLAN |
| | VIEW FOR ALL SANITARY AND STORM SEWERS. ADDITIONALLY, |
| | PLAN VIEW SHALL SHOW ALL EXISTING AND PROPOSED |
| | UNDERGROUND UTILITY LAYOUT, INCLUDING FIBER OPTIC, |
| | ELECTRIC, GAS, AND CABLEVISION & TELECOMMUNICATION |
| | FACILITIES LOCATED ON THE RIGHT-OF-WAY. PROVIDE PROFILE |
| | AND CLEARANCES AT ALL UTILITY CROSSINGS. ALL PROPOSED |
| | WATER MAIN SHALL BE SHOWN IN A PROFILE VIEW. |
| | |
| | PLEASE SHOW VERTICAL DATUM AND DATUM CONVERSION |
| | INFORMATION (NAVD 88 AND NGVD 29) ON ALL RELEVANT |
| | ENGINEERING PLAN SHEETS. |
| | |
| | PLEASE PROVIDE PROJECT ADDRESS ON ENGINEERING PLAN |
| | COVER SHEET. |
| | |
| | FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR |
| | CONCERNS, THANKS. |
| | |
| | RICK ROSSANO, PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX |
| | 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1098 |
| | FAX: (561) 494-1116 MOBILE: (561) 246-9525 |
| | EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING |
| | |
| | MANNY GONZALEZ, SENIOR ENGINEERING PROJECT COORDINATOR |
| | ENGINEERING SERVICES DEPARTMENT |
| | 401 CLEMATIS STREET, 4TH FLOOR |
| | WEST PALM BEACH, FL 33401 (MAILING ADDRESS: P.O. BOX |
| | 3366, ZIP 33402) |
| | MAIN PHONE: (561) 822-1200 DIRECT: (561) 494-1085 |
| | FAX: (561) 494-1116 MOBILE: (561) 644-7301 |
| | EMAIL: [email protected] WWW.WPB.ORG/ENGINEERING |
| | |
| |
Print |