| 2020-02-27 09:20:13 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE |
| | ENGINEERING PLAN SUBMITTAL RECEIVED 2/25/2020. THEY |
| | SHOULD NOT AFFECT THE SITE FOR SITE PLAN APPROVAL BUT |
| | WILL AFFECT THE ENGINEER PERMIT APPROVAL. |
| | |
| | 1. PARTS OF THE ALLEY WILL NEED TO BE RECONSTRUCTED AS |
| | INVERTED CROWN WITH THE APPROPRIATE PAVEMENT SECTION |
| | RATHER THAN MILLED AND RESURFACED. SOME OF THE PROPOSED |
| | SPOT GRADES ARE NEARLY 2 INCHES LOWER THAN THE EXISTING |
| | ASPHALT GRADE. VALLEY GUTTER MAY BE NEEDED DOWN THE |
| | CENTER OF THE ALLEY TO FACILITATE DRAINAGE. |
| | |
| | 2. ADDITIONAL SURVEY SPOT GRADES SHOULD BE OBTAINED |
| | ALONG THE NORTH RIGHT-OF-WAY LINE OF THE ALLEY TO |
| | CONFIRM THE PROPOSED PROFILE OF THE ALLEY WILL NOT |
| | AFFECT THE DRAINAGE OF THE PROPERTIES ON THE NORTH SIDE |
| | OF THE ALLEY. THE PLANS INDICATE THERE ARE DOORWAYS |
| | OPENING NEXT TO THE ALLEY WITH NOTES TO THE CONTRACTOR |
| | TO NOT GRADE ABOVE THE DOORWAY. THERE IS ALSO A |
| | PROPOSED SPOT GRADE OF 15.00 ON THE NORTH R/W SOUTH OF |
| | AN EXISTING SPOT GRADE OF 14.89. |
| | |
| | 3. OBTAIN THE FINISHED FLOOR ELEVATION FROM THE |
| | ARCHITECT FOR THE SECTION OF THE BUILDING ALONG |
| | QUADRILLE BLVD. SHOW THIS ELEVATION ON SECTION D-D. |
| | |
| | TRACY WARD, P.E. |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | [email protected] |
| | 561-494-1120 |
| |