Plan Review Notes
Plan Review Notes For Project Z19050020
Project Number Z19050020
Review Stop SURVEY
Sequence Number 5
Notes
Date Text
2020-02-12 08:25:491. PREVIOUS COMMENTS NOT ADDRESSED.
 2. AN ENGINEERING SUBMITTAL WAS MADE PRIOR TO SITE PLAN
 APPROVAL. SEE ADDITIONAL COMMENTS FROM MARK HURLEY W/
 CUSTOMER SERVICE, TRACY WARD AND RICK ROSSANO. PLEASE
 ADDRESS ALL COMMENTS IN WRITING AT NEXT SUBMITTAL.
 THESE WERE SENT TO THOMAS ENG. ON 2/6.
 3. FOR PLANNING - WHAT IS THE ALLOWABLE CANOPY
 ENCROACHMENT IN DATURA? HOW IS THIS CANOPY TO BE
 SUPPORTED?
  
  
  
 .FROM: RICK ROSSANO
 SENT: THURSDAY, FEBRUARY 06, 2020 1:28 PM
 TO: DANIELA MARTINAT ; JASON
 GUNTHER
 CC: MARK HURLEY ; MANUEL GONZALEZ
 ; TRACY WARD
 SUBJECT: COMMENTS FOR ENGINEERING PERMIT E20010032 -
 401 DATURA STREET, SENIOR APARTMENTS
  
 PLEASE FIND ENCLOSED COMMENTS FOR THE SUBJECT PROJECT
 FOR YOUR USE:
  
 COMMENTS FROM MARK HURLEY, CUSTOMER SERVICE SUPERVISOR,
 WPB PUBLIC UTILITIES, 561-822-2262, [email protected]
  
 -FIRE HYDRANT NEAR SE INTERSECTION SAYS ?RELOCATED?,
 BUT NOT KNOWN WHERE IT IS RELOCATED FROM. WHY DOES FIRE
 HYDRANT NEED TO BE RELOCATED INSTEAD OF EXTRA ONE
 ADDED?
  
 -EXISTING FIRE HYDRANT MISSING FROM SW INTERSECTION
 LARGE PLAN.
  
 -4 IN. DOMESTIC METER NEEDS TO BE ABOVE-GROUND
 INSTALLED USING SD WS-8 INSTEAD OF UNDERGROUND VAULT
 INSTALLED.
  
 -NEED TO HAVE ARROW POINTING FROM "4 IN. LEAD FREE RPZ"
 TO THE BACKFLOW ASSEMBLY ICON ON THE PLAN. ALSO ADD "WS
 7".
  
 -PLAN NOT SHOWING THE NEW WATER SERVICES ON DATURA
 WATER MAIN THAT FEED 499 EVERNIA ST.
  
 -SEE SOME NOTES THAT SAY "CAP WATER SERVICE AT MAIN".
 IF THOSE ARE WATER SERVICES WITH AN ASSOCIATED METER
 BOX NEED SHOW ON PLAN WHERE BOX IS AND ADD NOTE TO HAVE
 BOX REMOVED. NEED ALSO PUT WHAT HAPPENING TO OLD
 SERVICE LINE (REMOVED?)
 -NEED ARROW POINTING FROM 1 1/2 INCH RPZ TO THE ICON ON
 PLAN. ADD "WS 11"
  
 -SERVICE PIPING FOR 1 1/2 WATER SERVICE NOT LABELED
 WITH SIZE AND PIPE MATERIAL. ADD "WS 1" TO METER LABEL.
  
 -SERVICE PIPING AFTER 12 IN. X 4 IN. TAP NOT LABELED
 WITH SIZE AND PIPE MATERIAL. 4 IN. TAP WILL BE FEEDING
 4 IN. METER AND 1.5 IN. METER -> IS THAT TAP SIZE
 SUFFICIENT?
  
 -THE NEW WATER SERVICES HAVE PIPING THAT IS CROSSING
 EACH OTHER IN MULTIPLE LOCATIONS. CAN THE PIPING BE
 ADJUSTED SO THAT CROSSINGS ARE ELIMINATED?
  
 -RECOMMEND PARALLEL BACKFLOW ASSEMBLIES ON DOMESTIC
 WATER SERVICE TO ELIMINATE OUTAGES FOR CUSTOMER DURING
 BACKFLOW MAINTENANCE.
  
 -CAN POINT OF SERVICE GV FOR THE 6 IN. FIRE LINE BE
 RELOCATED SLIGHTLY NORTH INTO UE TO BE OUT OF FOOT
 TRAFFIC?
  
 -AFTER 4 IN. TAP THERE ARE TWO ICONS FOR GV?S. IS THAT
 CORRECT?
  
 -DO NOT SEE IRRIGATION USE IN THE DEMAND CHART. DOES IT
 NEED TO BE INCLUDED IN THE CHART?
  
 -LOOKS TO BE A LIGHT POLE TOO CLOSE TO FIRELINE WATER
 SERVICE. SHOULD BE 5 FEET AWAY FROM EACH OTHER.
  
 -POINT OF SERVICES LABEL INCORRECT ON DETAIL A.
  
 -ON THE NW AREA OF PLAN THERE ARE TWO SETS OF DOORS
 THAT OPEN OUTWARD INTO THE ROADWAY. DID NOT KNOW IF
 THAT IS SAFE?
  
 -IT IS VERY HARD TO SEE THE BOUNDARIES OF THE NEW
 UTILITY EASEMENT -> NEED TO MAKE CLEARER.
  
  
 THE FOLLOWING COMMENTS ARE PER TRACY L. WARD, P.E.,
 CITY OF WPB SENIOR STORMWATER ENGINEER:
  
 1. THE PROPOSED GRADING OF THE ALLEY WILL TRAP WATER ON
 THE PROPERTY ON THE NORTH SIDE OF THE ALLEY.
 2. THE SIDEWALK AT THE WEST END OF THE ALLEY SHOULD BE
 CONSTRUCTED OF CONCRETE INSTEAD OF BEING REPLACED WITH
 ASPHALT.
 3. ADD MORE PRB?S IN THE DRAINAGE STRUCTURES UPSTREAM
 OF THE EXFILTRATION TRENCHES TO EXTEND THE LIFE OF THE
 TRENCHES.
 4. THE EXFILTRATION EQUATION USED IN THE DRAINAGE
 CALCULATIONS IS NOT APPROPRIATE FOR THE LAYOUT OF THE
 TRENCHES. THE TRENCHES ARE ONLY SEPARATED BY 3 FEET AND
 EACH TRENCH WILL AFFECT THE FLOW RATE THROUGH THE SIDE
 OF THE ADJACENT TRENCH.
 5. PROPOSED SPOT GRADES OUTSIDE THE SOUTH AND WEST
 SIDES OF THE BUILDING ARE HIGHER THAN THE PROPOSED
 FINISHED FLOOR ELEVATION. SECTIONS A-A AND D-D ON SHEET
 C-07 DO NOT REFLECT THIS. THERE APPEAR TO BE DOOR
 OPENINGS ON THE WEST SIDE OF THE BUILDING.
 6. DIMENSION THE LOW SPOT OF THE ALLEY IN SECTION C-C
 ON SHEET C-07. STAFF IS UNCLEAR IF THE NOTE LOW SPOT IS
 CENTER OF ALLEY REFERS TO THE CENTER OF THE PROPOSED 20
 FT. ALLEY OR THE CENTER OF THE ALLEY R/W.
 7. IN SECTION C-C ON SHEET C-07 PROVIDE A DIMENSION FOR
 THE DISTANCE BETWEEN THE ALLEY R/W LINE AND THE SOUTH
 EDGE OF PAVEMENT.
  
 WITH REGARDS,
 TRACY L. WARD, P.E.
 SENIOR STORMWATER ENGINEER
 CITY OF WEST PALM BEACH
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS ST., 4TH FLOOR
 WEST PALM BEACH, FL 33401
 PHONE: 561-494-1120
 FAX: 561-494-1116
 CELL 561-351-0510
 [email protected]
  
  
 THE FOLLOWING COMMENTS ARE PER RICK ROSSANO, PROJ.
 COORDINATOR, ENG. SERVICES:
  
 PLEASE CLEARLY LABEL 12 IN. WATER MAIN WITH PIPE SIZE &
 MATERIAL.
  
 PLEASE ADD FIRE FLOW DEMANDS.
  
 PLEASE PROVIDE PERVIOUS/IMPERVIOUS CALCULATIONS TO
 DRAINAGE SHEET.
  
 PLEASE UPDATE STANDARD DETAIL GC-6.
  
  
 THANKS,
  
 RICK ROSSANO
 PROJECT COORDINATOR
 WPB ENGINEERING SERVICES
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 CELL: (561) 246-9525
 FAX: (561) 494-1116
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
  