Plan Review Notes For Project Z19050020
Project Number Z19050020
Review Stop STORM
Sequence Number 4
Notes
Date Text
2019-12-12 11:47:15THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 DECEMBER 5, 2019 REVIEW SUBMITTAL PACKAGE. NO WRITTEN
 RESPONSES WERE PROVIDED TO THE OCTOBER 2019 COMMENTS.
  
 1. SHEET C-07 CONTAINING THE CROSS SECTIONS IS NOT
 INCLUDED IN THE PACKAGE. [REPEAT COMMENT]
  
 2. PROVIDE CONDITION ASSESSMENT OF EXISTING CATCH BASIN
 IN THE ALLEY AND IF IT CAN BE MODIFIED TO ACCEPT THE
 NEW DRINAGE PIPE. [REPEAT COMMENT]
  
 3. IT APPEARS THE RECONSTRUCTION OF THE ALLEY WILL TRAP
 STORMWATER RUNOFF NORTH OF THE ALLEY. VERIFY THE MILL
 AND OVERLAY OF THE ALLEY WILL NOT AFFECT THE EXISTING
 SURFACE DRAINAGE OF THE OFFSITE AREAS. [REPEAT COMMENT]
  
 4. THE ONSITE DRAINAGE SYSTEM IS SHOWN TO BE
 EXILTRATION TRENCHES SIDE BY SIDE SIMILAR TO A DRAIN
 FIELD AND WITH TREES PLANTED OVER THE EXFILTRATION
 TRENCHES. THE FLOW OUT OF THE SIDES OF THE TRENCHES
 WILL BE AFFECTED BY THE ADJACENT TRENCHES. PROVIDE A
 DIFFERENT LAYOUT PATTERN OR CONSIDER A DIFFERENT TYPE
 OF STORAGE SYSTEM SUCH AS SUSPENDED PAVEMENT,
 STORMTRAP, CON/SPAN, ETC. [REPEAT COMMENT]
  
 5. IT APPEARS DRAINAGE STRUCTURE NO. 12 WILL BE A NEW
 STRUCTURE AND NEW STORM PIPE CROSSING DATURA ST. TO THE
 EXISTING CATCH BASIN ON THE SOUTH SIDE OF DATURA ST. IS
 STRUCTURE NO. 12 ADDED STRICTLY FOR CONNECTING THE
 OUTFALL PIPE FROM THE ONSITE EXFILTRATION SYSTEM? IS IT
 POSSIBLE TO CONNECT THE ONSITE SYSTEM TO THE EXISTING
 CATCH BASIN (CURB INLET) FURTHER TO THE EAST AT THE NW
 CORNER OF DATURA ST AND S. DIXIE HWY? [REPEAT COMMENT]
  
 6. LABEL THE STREETS ON SHEET C-05. [REPEAT COMMENT]
  
 7. LABEL THE EXISTING STORM PIPE SIZES AND PIPE
 MATERIAL. [REPEAT COMMENT]
  
 8. IT APPEARS SOME OF THE EXISTING ELEVATION DATA ON
 SHEET C-05 ARE IN REFERENCE TO NGVD1929 WHEREAS THERE
 IS A NOTE STATING ALL ELEVATION DATA ARE NAVD1988. BY
 WAY OF EXAMPLES, ALL OF THE LISTED GRATE ELEVATIONS FOR
 THE EXISTING CATCH BASINS ON THE SOUTH SIDE OF DATURA
 STREET ARE AT LEAST ONE FOOT HIGHER THAN THE GRATE
 ELEVATIONS FOR THE PROPOSED DRAINAGE STRUCTURES ON THE
 NORTH SIDE OF THE STREET. THE SOUTH INVERT ELEVATION
 FOR STRUCTURE NO. 12 IS LOWER THAN THE NORTH INVERT
 ELEVATION OF THE STRUCTURE THE DRAINAGE PIPE IS
 CONNECTING TO.
  
 9. WHAT IS THE PURPOSE FOR YARD DRAINS NOS. 15 AND 16?
  
 10. CONFIRM ALL OF THE ROOF DRAINS WILL DRAIN TO THE
 ONSITE WATER MANAGEMENT SYSTEM LOCATED ON THE EAST SIDE
 OF THE PROJECT.
  
 11. IT APPEARS YARD DRAIN NO. 9 WILL BE LOCATED IN THE
 STEPS TO THE PUBLIC PLAZA.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved