Plan Review Notes
Plan Review Notes For Project Z19050020
Project Number Z19050020
Review Stop STORM
Sequence Number 3
Notes
Date Text
2019-10-30 17:20:16THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 OCTOBER 11, 2019 REVIEW SUBMITTAL PACKAGE.
  
 1. SHEET C-07 CONTAINING THE CROSS SECTIONS IS NOT
 INCLUDED IN THE PACKAGE.
  
 2. PROVIDE CONDITION ASSESSMENT OF EXISTING CATCH BASIN
 IN THE ALLEY AND IF IT CAN BE MODIFIED TO ACCEPT THE
 NEW DRINAGE PIPE.
  
 3. IT APPEARS THE RECONSTRUCTION OF THE ALLEY WILL TRAP
 STORMWATER RUNOFF NORTH OF THE ALLEY. VERIFY THE MILL
 AND OVERLAY OF THE ALLEY WILL NOT AFFECT THE EXISTING
 SURFACE DRAINAGE OF THE OFFSITE AREAS.
  
 4. THE ONSITE DRAINAGE SYSTEM IS SHOWN TO BE
 EXILTRATION TRENCHES SIDE BY SIDE SIMILAR TO A DRAIN
 FIELD AND WITH TREES PLANTED OVER THE EXFILTRATION
 TRENCHES. THE FLOW OUT OF THE SIDES OF THE TRENCHES
 WILL BE AFFECTED BY THE ADJACENT TRENCHES. PROVIDE A
 DIFFERENT LAYOUT PATTERN OR CONSIDER A DIFFERENT TYPE
 OF STORAGE SYSTEM SUCH AS SUSPENDED PAVEMENT,
 STORMTRAP, CON/SPAN, ETC.
  
 5. IT APPEARS DRAINAGE STRUCTURE NO. 12 WILL BE A NEW
 STRUCTURE AND NEW STORM PIPE CROSSING DATURA ST. TO THE
 EXISTING CATCH BASIN ON THE SOUTH SIDE OF DATURA ST. IS
 STRUCTURE NO. 12 ADDED STRICTLY FOR CONNECTING THE
 OUTFALL PIPE FROM THE ONSITE EXFILTRATION SYSTEM? IS IT
 POSSIBLE TO CONNECT THE ONSITE SYSTEM TO THE EXISTING
 CATCH BASIN FURTHER TO THE EAST AT THE NW CORNER OF
 DATURA ST AND S. DIXIE HWY?
  
 6. LABEL THE STREETS ON SHEET C-05.
  
 7. LABEL THE EXISTING STORM PIPE SIZES AND PIPE
 MATERIAL.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  
  
  
  