| Plan Review Notes For Project Z19050020 |
| Project Number |
Z19050020 |
|
| Review Stop |
SURVEY |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2019-06-07 10:17:57 | 1. REPLAT WILL BE REQUIRED. | | | 2. THERE ARE 2 EXISTING COMPACTORS AND 2 RECYCLING | | | DUMPSTERS THAT WE WOULD LIKE TO RETAIN ON-SITE. | | | 3. NOT SURE IF REGRADING THE ALLEY WILL BE POSSIBLE TO | | | FLOW TO EASTERN CATCH BASIN. | | | 4. NEED TO REVIEW LOCATION OF METER AND BACKFLOW IN SW | | | CORNER. WILL NEED TO SEE BLOW-UP TO SCALE WITH PROPOSED | | | IMPROVEMENTS AND LANDSCAPING. | | | 5. MAINTENANCE AGREEMENT WILL BE REQUIRED FOR | | | IMPROVEMENTS/LANDSCAPING WITHIN RIGHT-OF-WAYS. | | | QUADRILLE WILL REQUIRE A LMOA WITH THE FDOT. | | | 6. EASEMENT MAY BE REQUIRED FOR WIDENED ALLEY. | | | 7. CANOPY WITHIN DATURA WILL NEED TO BE DISCUSSED. | | | 8. VERTICAL DATUM NEEDS TO BE ADDED TO ALL PLANS. | | | 9. APPROVAL FROM FPL WILL BE REQUIRED FOR ANY EASEMENT | | | ENCROACHMENT OR RELEASE. |
| |
Print |
|