Plan Review Notes
Plan Review Notes For Project Z19050020
Project Number Z19050020
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-06-10 18:32:52THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. THE CITY?S VERTICAL DATUM IS NGVD 1929. THE CITY HAS
 ALLOWED THE USE OF NAVD 1988 PROVIDED THE CONVERSION
 EQUATION TO NGVD 1929 IS PROVIDED ON THE SHEET(S).
 LABEL THE VERTICAL DATUM ON THE ENGINEERING SHEETS
 CONTAINING ELEVATION INFORMATION AND PROVIDE THE
 CONVERSION EQUATION TO NGVD1929.
  
 2. REVIEW THE GRATE ELEVATION OF 15.22 FT NAVD FOR
 STRUCTURE #11. IT IS SITUATED BETWEEN SPOT GRADES OF
 14.60 AND 14.40 FOR THE VALLEY GUTTER.
  
 3. EXISTING CATCH BASIN TO THE EAST OF THE VALLEY
 GUTTER SPOT GRADE 14.40 HAS A GRATE ELEVATION OF 14.85.
  
 4. PROPOSED PIPE BETWEEN PROPOSED YARD DRAIN #4 AND
 EXISTING CATCH BASIN WILL HAVE AN ADVERSE SLOPE. SOUTH
 INVERT ELEVATION AT YARD DRAIN IS 9.50. BOTTOM
 ELEVATION OF EXISTING CATCH BASIN IS 10.80.
  
 5. PROVIDE CROSS SECTIONS FOR THE PARKING AREA AND DROP
 AREA
  
 6. PROVIDE CROSS SECTION AND PAVEMENT DESIGN FOR THE
 ALLEY.
  
 7. REVISE YARD DRAIN #5 TO HAVE THE PRB ON THE EAST
 INVERT.
  
 8. WHICH STRUCTURE WILL CONTAIN A WEIR TO SURCHARGE THE
 EXFILTRATION TRENCHES.
  
 9. S. QUADRILLE BLVD. IS MAINTAINED BY FDOT. FDOT
 PERMITS WILL BE NEEDED FOR WORK WITHIN THE QUADILLE
 BLVD. RIGHT OF WAY.
  
 10. SIDEWALKS SHOULD BE GRADED TO DIRECT RUNOFF TO THE
 ONSITE DRAINAGE SYSTEM.
  
 11. PROVIDE CCTV VIDEOS OF THE THREE DRAINAGE PIPES ON
 DATURA STREET CONNECTED TO PROPOSED STRUCTURES #4, #10
 AND #11.
  
 12. SIDEWALK EASEMENT WILL BE NEEDED ADJACENT TO THE
 DROP OFF AREA.
  
 13. PORTE-COCHERE ENCROACHES INTO THE RIGHT-OF-WAY.
  
 14. HARDSCAPE FEATURES LOCATED WITH THE RIGHT-OF-WAY.
  
 15. TREES PROPOSED OVER AND ADJACENT TO THE
 EXFILTRATION SYSTEM.
  
 16. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD
 CRITERIA FOR WATER QUALITY TREATMENT AND PEAK FLOW
 ATTENUATION.
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING
 CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  