| Plan Review Notes For Project Z19050019 |
| Project Number |
Z19050019 |
|
| Review Stop |
TRAFFIC |
| Sequence Number |
4 |
|
| Notes |
| Date |
Text |
| 2019-10-15 16:11:33 | PASSED WITH THE FOLLOWING CONDITIONS: | | | CONDITIONS: | | | 1. THE DEVELOPER SHALL CONDUCT AN EVALUATION AT THE | | | INTERSECTION AT THE SOUTHWEST CORNER OF THE SITE FOR | | | REMOVAL OF THE EXISTING ALL-WAY STOP AND SHALL CONVERT | | | TO TWO-WAY STOP IF AN ALL-WAY STOP IS NOT WARRANTED, | | | ONE YEAR AFTER THE FOLLOWING CONDITIONS ARE MET: | | | A. CO IS ISSUED FOR AT LEAST 50% OF THE PROPOSED | | | APARTMENT, OFFICE USE, OR RETAIL USES. | | | B. CO IS ISSUED FOR AT LEAST 85% OF THE PROPOSED | | | APARTMENT, OFFICE USE, OR RETAIL USES. | | | C. THE LAST CO IS ISSUED FOR THE PROPOSED DEVELOPMENT. | | | 2. THE EVALUATION SHALL INCLUDE ANALYSES OF TRAFFIC | | | VOLUMES, SAFETY DATA AND SIGHT DISTANCES AND SHALL BE | | | COMPLETED BY A LICENSED ENGINEER. THE NECESSARY TRAFFIC | | | AND SAFETY DATA SHALL BE COLLECTED BY THE DEVELOPER FOR | | | THE ANALYSES. | | | 3. PROVIDE SURETY FOR THE TRAFFIC EVALUATION AND | | | REMOVAL OF THE ALL-WAY STOP UNTIL THE OBLIGATIONS | | | RELATED TO THE TWO-WAY STOP CONVERSION ANALYSES OR | | | CONSTRUCTION (#1 AND #2 ABOVE) ARE FULLY MET. | | | | | | | | | SHING TSOI | | | CITY IN-HOUSE TRAFFIC CONSULTANT | | | 561-494-1141 | | | [email protected] | | | (IN-HOUSE ON TUESDAYS AND WEDNESDAYS) |
| |
Print |
|