Plan Review Notes
Plan Review Notes For Project Z19050019
Project Number Z19050019
Review Stop STORM
Sequence Number 4
Notes
Date Text
2019-10-30 16:04:13THE PROPOSED DRAINAGE DESIGN IN THE OCTOBER 4, 2019
 SUBMITTAL PACKAGE SHOWS THE STORMWATER RUNOFF FROM THE
 SIDEWALK AND ROOF DRAINS DIRECTED TO ONSITE
 EXFILTRATION TRENCHES WITH NO DIRECT CONNECTION TO THE
 DRAINAGE SYSTEM IN THE PUBLIC RIGHT-OF-WAY. NO DRAINAGE
 CALCULATION HAVE BEEN SUBMITTED TO INDICATE THE AMOUNT
 OF RUNOFF THE EXFILTRATION TRENCHES CAN HANDLE. THE EOR
 MAY HAVE SAID THE 5-YEAR 24-HOUR STORM COULD BE HANDLED
 BY THE SYSTEM.
  
 UNLESS THE EXFILTRATION TRENCHES ARE PERIODICALLY
 MAINTAINED, THE STORAGE AND DISPOSAL CAPACITY OF THIS
 DRAINAGE SYSTEM WILL DIMINISH OVERTIME. IT WILL TAKE
 LONGER FOR THE STORED WATER TO FLOW OUT OF THE SLOTTED
 PIPE AND INTO THE GROUND TO GROUNDWATER. EVENTUALLY,
 THE TRENCHES ALONG THE PERIMETER OF THE SITE FOR
 CAPTURING THE SIDEWALK STORMWATER RUNOFF WILL NO LONG
 PERFORM THIS FUNCTION BECAUSE THE SYSTEM WILL BE FULL.
 THE OPPOSITE WILL LIKELY OCCUR IN THAT ROOF RUNOFF WILL
 BACKFLOW THROUGH THE PERIMETER TRENCHES AND FLOW ON THE
 SIDEWALK TO THE GUTTER IN THE R/W. SUFFICIENT HEAD
 PRESSURE COULD OCCUR IN THE DRAINAGE SYSTEM FROM THE
 ROOF DRAINS TO FORCE OPEN THE MANHOLES LIDS AND
 MINI-FOUNTAINS ERUPT WITH WATER SPILLING OUT ONTO THE
 SIDEWALK. BY THIS TIME THE EXFILTRATION TRENCHES WILL
 NEED TO BE DUG UP AND REPLACED WITH CLEAN STONE/ROCKS.
  
 DUE TO THE DEVELOPER'S AGREEMENT FOR CAPTURING THE
 STORMWATER RUNOFF, THE CITY COULD ADD AS A CONDITION OF
 APPROVAL THAT THE ONSITE DRAINAGE SYSTEM BE INSPECTED
 AND CERTIFIED ANNUALLY BY A FL P.E. THAT THE DRAINAGE
 SYSTEM IS PERFORMING AS ORIGINALLY DESIGNED.
  
 TRACY WARD, P.E.
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  