| Date |
Text |
| 2019-07-12 14:26:23 | FROM: RAY CARANCI, LANDSCAPE PLANNER 561-822-1462 |
| | PROJECT: OKEECHOBEE COMMERCIAL Z19050018 |
| | JULY 12, 2019 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | RESPONSES TO LANDSCAPE COMMENTS WERE NOT SUBMITTED. |
| | |
| | 1. NOT SATISFIED. PLEASE SHOW LOCATIONS OF ANY FPL |
| | TRANSFORMERS ON THE LANDSCAPE PLAN. |
| | THIS IS CRITICAL TO ESTABLISH LOCATIONS AT THIS POINT, |
| | AS LOCATIONS MAY DISPLACE REQUIRED LANDSCAPING. |
| | |
| | 2. NOT SATISFIED. PLEASE PROVIDE SCREENING FOR ALL |
| | GROUND MOUNTED EQUIPMENT AND UTILITIES. WATER BACKFLOW |
| | VALVES AND FPL TRANSFORMERS MUST HAVE SCREENING HEDGES. |
| | DUMPSTER ENCLOSURE SOUTH OF BUILDING #1- REVISE TO HAVE |
| | THE REQUIRED HEDGE ON ALL 3 NON ACCESS SIDES. |
| | |
| | 3. NOT SATISFIED. REQUIRED TREE OR EQUIVALENT IS |
| | MISSING IN TERMINAL ISLAND ADJACENT TO THE DUMPSTER |
| | ENCLOSURE AT THE NORTHWEST CORNER OF THE SITE. |
| | TERMINAL ISLAND IS NEEDED FOR THE ROW OF PARKING SOUTH |
| | SIDE OF BUILDING #1. A PARKING SPACE COULD BE REPLACED |
| | WITH TERMINAL LANDSCAPE ISLAND AND REQUIRED TREE TO |
| | SOLVE THE CONFLICT WITH LOADING, CROSSWALK AND FIRE |
| | HYDRANT. |
| | |
| | 4. NOT SATISFIED. THE LANDSCAPE PLAN DOES NOT REFLECT |
| | THE CIVIL PLANS DATED 5/13/19 SUBMITTED WITH THIS |
| | PETITION, AND THERE APPEAR TO BE MULTIPLE CONFLICTS |
| | WITH REQUIRED TREES. WATER AND SEWER LINES MAY NEED TO |
| | BE SHIFTED TO ALLOW REQUIRED TREES ADEQUATE ROOM IN THE |
| | LANDSCAPE AREAS. ADD ROOT BARRIER LOCATIONS AS |
| | REQUIRED. |
| | LANDSCAPE PLAN DOES NOT MATCH THE 6/27/19 CIVIL |
| | DRAWINGS FOR UTILITIES. STILL MANY CONFLICTS. |
| | |
| | |
| | CONDITIONS OF APPROVAL |
| | 1. PRIOR TO THE REMOVAL OR RELOCATION OF ANY TREES ON |
| | THE PROPERTY, A TREE ALTERATION PERMIT SHALL BE |
| | SUBMITTED, REVIEWED AND APPROVED BY THE DEVELOPMENT |
| | SERVICES DEPARTMENT, PLANNING DIVISION. |
| | |
| |