| Plan Review Notes For Project Z19050015 |
| Project Number |
Z19050015 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-07-29 11:19:04 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 7/11/19 SUBMITTAL PACKAGE: | | | | | | 1. LABEL THE DRY RETENTION AREA AS DRY DETENTION AREA | | | UNLESS IT IS SIZED TO STORE THE RUNOFF FROM THE 25-YEAR | | | 3-DAY DESIGN STORM WITH NO DISCHARGE. | | | | | | 2. PROVIDE ADIDITIONAL FREEBOARD BETWEEN THE WEIR | | | ELEVATION IN STRUCTURE CS AND THE TOP OF BERM AROUND | | | THE RETENTION AREA.THE RETENTION AREA WILL SPILL OVER | | | ONTO THE ACCESS ROAD AND DOWN THE DRIVEWAY AS WATER | | | FLOWS OVER THE WEIR. | | | | | | 3. PROPOSED FPL EASEMENT LINES ARE NOT SHOWN ON THE | | | SITE PLAN. | | | | | | TRACY L. WARD, P.E. | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] |
| |
Print |
|