| 2019-06-10 18:43:53 | THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL |
| | DETAILS, DESIGN CALCULATIONS AND THE POLLUTION |
| | PREVENTION PLAN WILL BE REVIEWED AS PART OF THE |
| | ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT |
| | APPLICATION PROCESSES. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT |
| | |
| | HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR |
| | MS,-PERMITS-APPLICATIONS |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE |
| | PLAN APPROVAL: |
| | |
| | 1. ADD VERTICAL DATUM REFERENCE TO ALL SHEETS |
| | CONTAINING ELEVATION INFORMATION (SHEETS C-03, C-04, |
| | C-05, C-09). |
| | |
| | 2. WHAT ARE THE TWO TRANSVERSE STRIPED AREAS IN THE |
| | PARKING LOT NORTH OF THE PERSONAL CARE CENTER TO BE |
| | USED FOR? |
| | |
| | 3. CONSIDER REDUCING THE DEPTH OF THE PARKING SPACES |
| | AND HAVING A TWO-FOOT OVERHANG ON THE NORTH SIDE OF THE |
| | PARKING LOT NORTH OF THE PERSONAL CARE CENTER. |
| | |
| | 4. GREENWOOD AVE IS MAINTAINED BY PALM BEACH COUNTY. |
| | COUNTY PERMITS WILL BE NEEDED FOR WORK WITHIN THE |
| | RIGHT-OF-WAY. COUNTY DETAILS MAY NEED TO BE INCLUDED IN |
| | THE PLANS. |
| | |
| | 5. DRAINAGE SYSTEM TO BE DESIGNED TO MEET SFWMD |
| | CRITERIA FOR WATER QUALITY TREATMENT AND PEAK FLOW |
| | ATTENUATION. |
| | |
| | 6. IS CROSSWALK STRIPING NEEDED TO NEW HANDICAP PARKING |
| | SPACES EAST OF THE EXISTING BUILDING? |
| | |
| | THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO |
| | ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING |
| | BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL. |
| | |
| | 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY |
| | BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT. |
| | THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS |
| | CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE |
| | ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS |
| | |
| | 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED |
| | WITH THE ENGINEERING PERMIT APPLICATION. |
| | |
| | 3. PROVIDE A COPY OF THE SFWMD ERP PRIOR TO STARTING |
| | CONSTRUCTION. |
| | |
| | TRACY WARD, PE |
| | SENIOR STORMWATER ENGINEER |
| | ENGINEERING SERVICES DEPARTMENT |
| | 561-494-1120 |
| | [email protected] |
| | |
| |