Plan Review Notes
Plan Review Notes For Project Z19040020
Project Number Z19040020
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-05-07 18:28:29THIS IS A CONCEPTUAL LEVEL REVIEW. CONSTRUCTION LEVEL
 DETAILS, DESIGN CALCULATIONS AND THE POLLUTION
 PREVENTION PLAN WILL BE REVIEWED AS PART OF THE
 ENGINEERING DEVELOPMENT APPROVAL AND BUILDING PERMIT
 APPLICATION PROCESSES. THE ENGINEERING DEVELOPMENT
 APPROVAL APPLICATION FORMS CAN BE DOWNLOADED AT
 HTTP://WPB.ORG/DEPARTMENTS/ENGINEERING-PUBLIC-WORKS/FOR
 MS,-PERMITS-APPLICATIONS
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO SITE
 PLAN APPROVAL:
  
 1. CONSIDER REDUCING THE LENGTH OF PARKING SPACES AND
 PROVIDING 2? PARKING OVERHANG FOR THE PARKING SPACES
 FACING WEST IN THE NEW PARKING LOT WEST OF THE BUILDING
 AND THE RECONFIGURED PARKING SOUTHWEST OF THE FUEL
 PUMPS.
  
 2. REVIEW THE ORIGINAL GRADING PLAN FOR THE DETENTION
 AREA EAST OF THE BUILDING AND DETERMINE IF THIS AREA
 NEEDS TO BE REGRADED.
  
 3. ELEVATION OF NEW TRENCH DRAIN FOR WEST DRIVEWAY
 SHOULD NOT BE BELOW THE MINIMUM PERMITTED PERIMETER
 ELEVATION.
  
 4. ARE THE GREASE TRAPS IN A SERVICEABLE LOCATION.
 CONSIDER RELOCATING THE SEWER LINE FROM THE GREASE
 TRAPS AWAY FROM THE EXISTING TREES.
  
 5. 45TH STREET IS MAINTAINED BY FDOT OR PALM BEACH
 COUNTY. FDOT OR COUNTY APPROVAL WILL BE NEEDED FOR
 PROPOSED IMPROVEMENTS IN THE 45TH ST. RIGHT OF WAY.
  
 6. STOP BARS SHOULD BE LOCATED MINIMUM 4 FEET FROM
 SIDEWALKS.
  
 7. ADD PLAT BOOK AND PAGE (103/10) FOR HARLEY DAVIDSON
 PROPERTY TO THE EAST.
  
  
 THE FOLLOWING COMMENTS MUST BE ADDRESSED PRIOR TO
 ISSUANCE OF CONSTRUCTION AUTHORIZATION INCLUDING
 BUILDING PERMITS AND ENGINEERING DEVELOPMENT APPROVAL.
  
 1. AN ENGINEERING DEVELOPMENT APPROVAL APPLICATION MAY
 BE REQUIRED FROM THE ENGINEERING SERVICES DEPARTMENT.
 THE ENGINEERING DEVELOPMENT APPROVAL APPLICATION FORMS
 CAN BE DOWNLOADED AT: HTTP://WPB.ORG/DEPARTMENTS/ENGINE
 ERING-PUBLIC-WORKS/FORMS,-PERMITS-APPLICATIONS
  
 2. EROSION CONTROL PLAN AND DETAILS TO BE SUBMITTED
 WITH THE ENGINEERING PERMIT APPLICATION.
  
 3. PROVIDE A COPY OF THE SFWMD ERP MODIFICATION PRIOR
 TO STARTING CONSTRUCTION.
  
 4. PROVIDE A COPY OF THE NPBCID PERMIT MODIFICATION
 PRIOR TO STARTING CONSTRUCTION.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  