Plan Review Notes
Plan Review Notes For Project Z19040020
Project Number Z19040020
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2019-05-02 12:49:58PROVIDE STORMWATER POLLUTION PREVENTION PLAN FOR
 ENGINEERING SUBMITTALS.
  
 PROVIDE PROFILE AND CLEARANCES AT ALL UTILITY
 CROSSINGS.
  
 PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
  
 PROVIDE DEMANDS FOR WATER (PROPOSED DOMESTIC AND
 IRRIGATION) AND SEWER (AVERAGE, MAXIMUM & PEAK) AND
 FIRE FLOW DEMANDS. CALCULATIONS SHALL BE PER FAC 64E-6
 FOR SEWER AND PER FAC 64-E.008 FOR WATER.
 PLEASE PROVIDE MORE DETAILS ON DRAINAGE CONNECTION;
 DRAINAGE FROM NORTH PROPERTY MAY AFFECT YOUR ONSITE
 DRAINAGE.
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved