Plan Review Notes
Plan Review Notes For Project Z19040018
Project Number Z19040018
Review Stop ENG - PPRC
Sequence Number 1
Notes
Date Text
2019-05-02 13:03:47SHOW VERTICAL DATUM AND DATUM CONVERSION INFORMATION
 (NAVD 88 AND NGVD 29).
  
 PLEASE PROVIDE CALCULATIONS OF REVISED PERVIOUS AND
 IMPERVIOUS CALCULATIONS FOR THE PROPOSED IMPACTED
 AREAS.
  
 PLEASE PROVIDE CCTV FOR SANITARY SEWER LINES UNDERNEATH
 AND ADJACENT TO PROPOSED BASKETBALL COURTS.
  
 PLEASE CONSIDER SUBMITTING A FORMAL AS-BUILT REQUEST
 FOR ALL CITY OF WEST PALM BEACH-OWNED UTILITIES WITHIN
 THE PUBLIC RIGHT OF WAY FOR THE ENTIRE EXTENT OF THE
 LIMITS OF YOUR PROJECT. IDENTIFY TYPE OF UTILITY,
 LOCATION, PIPE MATERIAL, AGE AND SIZE. PLEASE CONTACT
 JANICE TARBILL IN THE WPB ENGINEERING SERVICES
 DEPARTMENT AT [email protected] OR 561-494-1079 FOR
 FURTHER ASSISTANCE. NOTE THAT FIELD RECORDS ARE FOR
 INFORMATION ONLY. FIELD VERIFY UTILITY LOCATIONS USING
 FIELD SURVEY, POT-HOLING, SOFT DIGS ETC.
  
 FEEL FREE TO CONTACT US IF YOU HAVE ANY QUESTIONS OR
 CONCERNS, THANKS.
 RICK ROSSANO
 PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1098
 FAX: (561) 494-1116
 MOBILE: (561) 246-9525
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 MANNY GONZALEZ
 SENIOR ENGINEERING PROJECT COORDINATOR
 ENGINEERING SERVICES DEPARTMENT
 401 CLEMATIS STREET, 4TH FLOOR
 WEST PALM BEACH, FL 33401
 (MAILING ADDRESS: P.O. BOX 3366, ZIP 33402)
 MAIN PHONE: (561) 822-1200
 DIRECT: (561) 494-1085
 FAX: (561) 494-1116
 MOBILE: (561) 644-7301
 EMAIL: [email protected]
 WWW.WPB.ORG/ENGINEERING
  
 CENTRAL OPERATIONS CENTER (DISPATCH):
 24-HOUR EMERGENCY RESPONSE SERVICES TO PUBLIC
 UTILITIES, PUBLIC WORKS, PARKS, ETC. 561-822-2210
  
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved