| Plan Review Notes For Project Z19040015 |
| Project Number |
Z19040015 |
|
| Review Stop |
STORM |
| Sequence Number |
2 |
|
| Notes |
| Date |
Text |
| 2019-07-01 08:27:52 | THE COMMENTS BELOW ARE FROM THE REVIEW OF THE JULY 27, | | | 2019 SUBMITTAL PACKAGE: | | | | | | 1. ON SHEET PD2 ADD THE VERTICAL DATUM REFERENCE AND | | | THE CONVERSION EQUATION TO NGVD1929. ON SHEET PD3 ADD | | | THE CONVERSION EQUATION TO NGVD1929. | | | | | | 2. CONSIDER ADDING ADDITIONAL STEPS BETWEEN GARAGE AND | | | INTERIOR OF UNITS IN ORDER TO FLATTEN DRIVEWAY SLOPES. | | | SOME DRIVEWAYS SLOPES APPEAR TO BE GREATER THAN 14.5%. | | | | | | 3. SHOW THE DRAINAGE AND MAINTENANCE EASEMENTS ON SHEET | | | PD1. | | | | | | 4. THE CURB RAMP ON THE EAST SIDE OF THE ALLEY WILL | | | NEED TO BE CONSTRUCTED TO CURRENT ADA CODES. | | | | | | 5. ENSURE THE SWALES WITHIN THE ALLEY RIGHT OF WAY HAVE | | | POSITIVE DRAINAGE TO CONNISTON ROAD. | | | | | | TRACY L. WARD, P.E. | | | SENOIR STORMWATER ENGINEER | | | ENGINEEERING SERVICES DEPARTMENT | | | [email protected] | | | 561-494-1120 |
| |
Print |
|