Plan Review Notes
Plan Review Notes For Project Z19040015
Project Number Z19040015
Review Stop STORM
Sequence Number 2
Notes
Date Text
2019-07-01 08:27:52THE COMMENTS BELOW ARE FROM THE REVIEW OF THE JULY 27,
 2019 SUBMITTAL PACKAGE:
  
 1. ON SHEET PD2 ADD THE VERTICAL DATUM REFERENCE AND
 THE CONVERSION EQUATION TO NGVD1929. ON SHEET PD3 ADD
 THE CONVERSION EQUATION TO NGVD1929.
  
 2. CONSIDER ADDING ADDITIONAL STEPS BETWEEN GARAGE AND
 INTERIOR OF UNITS IN ORDER TO FLATTEN DRIVEWAY SLOPES.
 SOME DRIVEWAYS SLOPES APPEAR TO BE GREATER THAN 14.5%.
  
 3. SHOW THE DRAINAGE AND MAINTENANCE EASEMENTS ON SHEET
 PD1.
  
 4. THE CURB RAMP ON THE EAST SIDE OF THE ALLEY WILL
 NEED TO BE CONSTRUCTED TO CURRENT ADA CODES.
  
 5. ENSURE THE SWALES WITHIN THE ALLEY RIGHT OF WAY HAVE
 POSITIVE DRAINAGE TO CONNISTON ROAD.
  
 TRACY L. WARD, P.E.
 SENOIR STORMWATER ENGINEER
 ENGINEEERING SERVICES DEPARTMENT
 [email protected]
 561-494-1120
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved