2019-04-08 12:19:18NO COMMENTS ON THE PROPOSED PLAT.
  
 PRELIMINARY COMMENTS FOR SITE PLAN:
 1. A MASTER DRAINAGE SYSTEM CONSISTING OF CATCH BASINS,
 EXFILTRATION TRENCHES, STORM PIPES AND IS PROPOSED FOR
 THE PROJECT. IT IS RECOMMENDED THE APPLICANT MEET WITH
 SFWMD REGARDING REQUIRED EASEMENTS AND THE LEGAL ENTITY
 TO BE IN PLACE TO OPERATE AND MAINTAIN THE MASTER
 DRAINAGE SYSTEM AFTER THE SYSTEM IS CONSTRUCTED.
  
 2. MASTER DRAINAGE SYSTEM TO BE DESIGNED TO SFWMD
 CRITERIA, INCLUDING WATER QUALITY TREATMENT AND OFFSITE
 DISCHARGE.
  
 3. ENGINEERING PLANS WILL BE NEEDED FOR SITE PLAN
 APPROVAL.
  
 4. VERTICAL DATUM TO BE LISTED ON ANY PLAN SHEET WITH
 ELEVATION DATA. THE CITY?S VERTICAL DATUM IS NGVD 1929.
 THE CITY HAS ALLOWED THE USE OF NAVD 1988 PROVIDED THE
 CONVERSION EQUATION TO NGVD 1929 IS PROVIDED ON THE
 SHEET(S).
  
 5. ADD THE VERTICAL DATUM CONVERSION EQUATION TO THE
 ALTA/NSPS LAND TITLE SURVEY.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved