| 2019-04-08 12:19:18 | NO COMMENTS ON THE PROPOSED PLAT. | | | | | | PRELIMINARY COMMENTS FOR SITE PLAN: | | | 1. A MASTER DRAINAGE SYSTEM CONSISTING OF CATCH BASINS, | | | EXFILTRATION TRENCHES, STORM PIPES AND IS PROPOSED FOR | | | THE PROJECT. IT IS RECOMMENDED THE APPLICANT MEET WITH | | | SFWMD REGARDING REQUIRED EASEMENTS AND THE LEGAL ENTITY | | | TO BE IN PLACE TO OPERATE AND MAINTAIN THE MASTER | | | DRAINAGE SYSTEM AFTER THE SYSTEM IS CONSTRUCTED. | | | | | | 2. MASTER DRAINAGE SYSTEM TO BE DESIGNED TO SFWMD | | | CRITERIA, INCLUDING WATER QUALITY TREATMENT AND OFFSITE | | | DISCHARGE. | | | | | | 3. ENGINEERING PLANS WILL BE NEEDED FOR SITE PLAN | | | APPROVAL. | | | | | | 4. VERTICAL DATUM TO BE LISTED ON ANY PLAN SHEET WITH | | | ELEVATION DATA. THE CITY?S VERTICAL DATUM IS NGVD 1929. | | | THE CITY HAS ALLOWED THE USE OF NAVD 1988 PROVIDED THE | | | CONVERSION EQUATION TO NGVD 1929 IS PROVIDED ON THE | | | SHEET(S). | | | | | | 5. ADD THE VERTICAL DATUM CONVERSION EQUATION TO THE | | | ALTA/NSPS LAND TITLE SURVEY. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |
Print |
|