| Plan Review Notes For Project Z19010033 |
| Project Number |
Z19010033 |
|
| Review Stop |
STORM |
| Sequence Number |
1 |
|
| Notes |
| Date |
Text |
| 2019-02-15 11:33:57 | THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE | | | 2/5/19 SUBMITTAL PACKAGE: | | | | | | 1. LABEL THE VERTICAL DATUM AND PROVIDE THE | | | RELATIONSHIP TO NGVD1929 ON ALL SHEETS WITH ELEVATION | | | DATA. | | | | | | 2. IDENTIFY WHERE THE CONTROL STRUCTURES ARE TO | | | SURCHARGE THE EXFILTRATION TRENCHES. | | | | | | 3. INDICATE HOW WATER QUALITY TREATMENT IS BEING | | | PROVIDED FOR THE STORMWATER RUNOFF IN THE EASTERN PART | | | OF THE PROJECT. | | | | | | 4. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED IN | | | COMPLIANCE WITH SFWMD ERP CRITERIA. | | | | | | TRACY WARD, PE | | | SENIOR STORMWATER ENGINEER | | | ENGINEERING SERVICES DEPARTMENT | | | 561-494-1120 | | | [email protected] | | | |
| |