Plan Review Notes
Plan Review Notes For Project Z19010033
Project Number Z19010033
Review Stop STORM
Sequence Number 1
Notes
Date Text
2019-02-15 11:33:57THE FOLLOWING COMMENTS ARE FROM THE REVIEW OF THE
 2/5/19 SUBMITTAL PACKAGE:
  
 1. LABEL THE VERTICAL DATUM AND PROVIDE THE
 RELATIONSHIP TO NGVD1929 ON ALL SHEETS WITH ELEVATION
 DATA.
  
 2. IDENTIFY WHERE THE CONTROL STRUCTURES ARE TO
 SURCHARGE THE EXFILTRATION TRENCHES.
  
 3. INDICATE HOW WATER QUALITY TREATMENT IS BEING
 PROVIDED FOR THE STORMWATER RUNOFF IN THE EASTERN PART
 OF THE PROJECT.
  
 4. STORMWATER MANAGEMENT SYSTEM TO BE DESIGNED IN
 COMPLIANCE WITH SFWMD ERP CRITERIA.
  
 TRACY WARD, PE
 SENIOR STORMWATER ENGINEER
 ENGINEERING SERVICES DEPARTMENT
 561-494-1120
 [email protected]
  
  Print


Account Summary | Usage Policy | Privacy Policy
Copyright © 2005 – 2014, SunGard Pentamation, Inc & City of West Palm Beach, FL – All Rights Reserved