| Date |
Text |
| 2019-12-20 16:06:27 | FROM: RAY CARANCI, LANDSCAPE PLANNER |
| | PROJECT: 3111 S DIXIE MINOR PD AMENDMENT Z18120015 |
| | DECEMBER 20, 2019 |
| | I HAVE REVIEWED THE ABOVE REFERENCED PETITION, AND |
| | PROVIDE THE FOLLOWING COMMENTS: |
| | |
| | 1. SATISFIED. DUE TO THE NUMBER OF CHANGES TO THE |
| | LANDSCAPE PLAN, ALL AREAS CHANGED FROM THE APPROVED |
| | PLANS MUST BE CLOUDED. STAFF WILL ACCEPT AN INTERIM |
| | SUBMITTAL FOR THESE PLANS IN ORDER TO PERFORM A |
| | COMPLETE REVIEW IN A TIMELY MANNER. |
| | CHANGES TO THE PARKING AND TERMINAL LANDSCAPE ISLANDS |
| | ADJACENT TO THE SOUTH SIDE OF THE POOL AND CLUBHOUSE |
| | WERE NOT CLOUDED OR ADDRESSED, AND DO NOT MEET CODE |
| | 21REQUIREMENTS. THERE ARE MULTIPLE CHANGES FROM THE |
| | PLANS APPROVED WITH RESOLUTION NO. 227-18, DATED |
| | 5/11/18. |
| | |
| | 2. SATISFIED. CORRECT THE SHEET REFERENCES ON THE MATCH |
| | LINES TO CORRESPOND TO THE APPROVED PLANS AND CURRENT |
| | PLAN SET. |
| | |
| | 3. SATISFIED. INDICATE THE TREES COUNTED TOWARD THE 42 |
| | INDICATED ON SHEET LP-6 FOR THE EAST BUFFER ON SHEET |
| | LP-4 AND LP-5. |
| | 4. SATISFIED. INDICATE THE TREES COUNTED TOWARD THE 41 |
| | INDICATED ON SHEET LP-6 FOR THE WEST BUFFER ON SHEETS |
| | LP-2 AND LP-3. |
| | 5. SATISFIED. INDICATE THE TREES COUNTED TOWARD THE 21 |
| | INDICATED ON SHEET LP-6 FOR THE SOUTH BUFFER ON SHEETS |
| | LP-2 AND LP-4. |
| | |
| | 6. SATISFIED. THE TOTAL NUMBER OF TREES PROVIDED |
| | APPEARS TO HAVE CHANGED. ADDRESS THE CHANGED COUNTS ON |
| | SHEET LP-6 IN THE LANDSCAPE REQUIREMENT CHART. |
| | |
| | 7. SATISFIED. PROVIDE THE REQUIRED TREE (OR EQUIVALENT |
| | PALMS) AND TERMINAL LANDSCAPE ISLANDS FOR ALL THE ROWS |
| | OF PARKING AS SHOWN ON THE APPROVED PLANS. TREES HAVE |
| | BEEN REMOVED FROM THE PLAN, AND THESE AREAS NO LONGER |
| | MEET THE CODE REQUIREMENT. MANY EXAMPLES APPEAR TO HAVE |
| | FPL TRANSFORMERS DISPLACING THE APPROVED TREE. SOME |
| | ISLANDS HAVE REDUCED THE NUMBER OF PALMS FROM 3 TO 2. |
| | PLEASE EXPLAIN AND REVISE. |
| | THERE ARE STILL TERMINAL ISLANDS THAT DO NOT MEET THE |
| | CODE REQUIREMENT. CHANGES TO THE BUILDING AFFECTING |
| | TERMINAL LANDSCAPE ISLANDS ADJACENT TO THE SOUTH SIDE |
| | OF THE POOL AND CLUBHOUSE WERE NOT CLOUDED OR |
| | ADDRESSED, AND DO NOT MEET CODE REQUIREMENTS OR THE |
| | APPROVED PLAN. |
| | |
| | |
| | 8. SATISFIED. SHOW LOCATIONS OF ROOT BARRIERS TO |
| | PROTECT INFRASTRUCTURE AND TREES FROM CONFLICTS. THIS |
| | INCLUDES WATER, SEWER, DRAINAGE, SIDEWALKS AND CURBS, |
| | AND ANY FIELD STRUCTURES THAT COULD BE IMPACTED BY TREE |
| | ROOTS. IF A SEPARATE SHEET IS NEEDED, PLEASE PROVIDE IT |
| | AT THIS TIME FOR REVIEW. |
| | |
| | 9. SATISFIED. PROVIDE SCREENING FOR ALL GROUND MOUNTED |
| | EQUIPMENT AND UTILITIES. |
| | SOME VALVES AND TRANSFORMERS ARE NOT SCREENED ON THE |
| | LANDSCAPE PLAN. PLEASE REVISE. |
| | ALL GROUND MOUNTED EQUIPMENT WILL BE REQUIRED TO HAVE |
| | SCREENING AT THE TIME OF FINAL INSPECTION. STAFF IS |
| | AWARE OF FPL REQUIREMENTS, AND MANY AREAS AS SHOWN ON |
| | THE PLAN CAN ACCOMMODATE A SCREENING HEDGE. |
| | |
| | 10. SATISFIED. IN REVIEWING THE REVISED TREE |
| | DISPOSITION CHART, THE FOLLOWING COMMENTS NEED TO BE |
| | ADDRESSED: |
| | ? CANOPY MEASUREMENT ON DISPOSITION LIST IN FEET |
| | APPEARS TO BE RADIUS, NOT DIAMETER. PLEASE CORRECT. |
| | ? AREA OF CANOPY COVERAGE IS CALCULATED AS PI TIMES |
| | RADIUS SQUARED. PLEASE CORRECT. |
| | ? TOTAL ALL CANOPY CALCULATIONS FOR TREES AND PALMS |
| | REMOVED BY CATEGORY FOR 1:1 AND SQUARE FOOTAGE FOR ALL |
| | 20 FEET AND ABOVE DIAMETER. |
| | ? PROVIDE A TOTAL BY CATEGORY FOR ALL NEW TREES |
| | PROPOSED. CATEGORY 1 =300 SQ FT, CATEGORY 2 =150 SQ FT, |
| | CATEGORY 3= 100 SQ FT, CATEGORY 4 = 50 SQ FT. |
| | |
| | 11. SATISFIED. THE TOTAL TREES PROVIDED HAS DROPPED |
| | FROM 445 ON THE APPROVED PLANS TO 437. EXPLAIN THE |
| | CHANGE. |
| | |
| | CONDITIONS OF APPROVAL |
| | |
| | 1. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE PERMITTING AND INSTALLATION OF THE |
| | STREET TREES, TREE GRATES, RIGHT OF WAY LANDSCAPING AND |
| | IRRIGATION APPROVED WITH THIS PETITION. |
| | |
| | 2. THE APPLICANT, SUCCESSORS AND ASSIGNS SHALL BE |
| | RESPONSIBLE FOR THE MAINTENANCE OF THE ROAD RIGHT OF |
| | WAY LANDSCAPING, TREE GRATES AND IRRIGATION ADJACENT TO |
| | THE PROPERTY. THIS WILL BE THROUGH A SEPARATE |
| | MAINTENANCE AGREEMENT WITH THE CITY. |
| | |
| |
Print |